4. Secure red wire into RLY 1 terminal, and black wire into +COM
terminal on Clack® control board.
5. Replace control valve front cover.
6. Plug the supplied wall transformer into a wall outlet. Plug the
male DC plug into the female DC jack located at the back of the
OzotechEOG.
7. Program ozone start and end schedule using control valve PCB.
4.2 Installation Continued
6.
a. Enter cycle programming mode
b. Set backwash to 14 minutes
c. Set draw time to 40 minutes
d. Turn off fill
e. Turn off rinse
f. Set relay to “on”
g. Set the relay on time to 15 minutes (one minute longer
than backwash)
h. Set the relay duration for 38 minutes (2 minutes less than
draw time)
i. Return to service
j. Press regeneration button to lock in timing