5.1 Ozone Generator Maintenance Cont.
4. Reinstall clean, dry CD cell into OzotechEOG in reverse order,
making sure all air and electrical connections are secure.
Frequency of Maintenance: Every 12 months
Perform the following general maintenance and CD cell cleaning
procedure:
1. Disconnect OzotechEOG from power source.
2. Remove cover.
3. Inspect the inside of the generator for dust and moisture.
4. Thoroughly clean and dry the inside of the generator.
5. Replace top cover.
6. Replace any in-line and brine elbow check valves.
5.2 Maintenance Timer Service Reset Instructions:
Normally the EOG II controller board will signal cell maintenance is
due by changing the LED indicator light to an orange color, once
service has been performed then the timer will be reset simply by
pressing the “Alarm Reset” button.
However, if a technician services or replaces the cell prior to the
one-year service signal is displayed, a “forced reset” on the timer
should be performed.
11.