![Ozotech AIM BTU 1000 Installation And Service Manual Download Page 9](http://html.mh-extra.com/html/ozotech/aim-btu-1000/aim-btu-1000_installation-and-service-manual_1667158009.webp)
M43-31334&5 REV A
5
9. Pressure check your unit.
a. With the unit powered down and a source of positive pressure flowing into the unit,
open the airflow meter until the indicating ball reaches the top of the scale.
b. Remove the ozone delivery tubing from the venturi injector inlet (or equivalent) and
seal to pressurize the generator and ozone delivery tubing.
c. Using a suitable leak check solution (available through your Ozotech, Inc., dealer) check
for leaks at the tube/chamber interface, tubing connections, etc. Immediately correct
any leaks prior to placing your unit back in service.
Figure 1. CD Cell Interface
Summary of Contents for AIM BTU 1000
Page 1: ...AIM BTU 1000 2000 Ozone Generators Installation and Service Manual M43 31334 5 REV A ...
Page 10: ...M43 31334 5 REV A 6 Figure 2 CD Cell Cap Removal and Installation ...
Page 11: ...M43 31334 5 REV A 7 Figure 3 CD Cell Manifold Assembly ...
Page 18: ...M43 31334 5 REV A Figure 8 Left Side Interior View Figure 7 Front Interior View 14 ...
Page 19: ...M43 31334 5 REV A Figure 9 Right Side Interior View 15 ...
Page 20: ...M43 31334 5 REV A Figure 10 AIM BTU 1000 2000 Wiring Diagram 16 ...
Page 23: ...Ozotech Inc 1015 South Main Street Yreka CA 96097 Ph 530 842 4189 ozotech com ...