background image

5. PRODUCT ASSEMBLY AND OPERATION

4. Dehumidifier

V

oltage

110/220V

Capability

150 L / Minute

Pressure

0.8mPa

Power

300 Watt

W

eight

5kg / 12 LPS

Working Scheme

Installation

1. Please open the accessory box before installation accessories

7

Summary of Contents for Wheel Chair Ready Type Chamber

Page 1: ...PO Box 2301 Naperville IL 60540 USA 630 452 8431 SalesTeam HyperbaricPro com www HyperbaricPro com AIR COMPRESSOR AIR DEHUMIDIFIER...

Page 2: ...tem for the first time Keep this manual handy for your reference Please ensure that all items are removed from the box before trowing the box away Some customers have thrown away the protective paddin...

Page 3: ...aintenance and Cultivation 8 FAQ 9 Faults and Troubleshooting 10 Condition for Transportation and Storage 4 4 5 6 7 9 11 12 13 14 14 CONTENTS Installation Working Scheme Accessories Air Compressor and...

Page 4: ...e following table is a list of symbols and definitions that used with the Hyperbaric Chamber MILD HYPERBARIC OXYGEN THERAPY Authorized Representative In The European Community HOT Surface Do Not Touch...

Page 5: ...people with severe infectious diseases and patients 2 Bad colds Pneumothorax patients 3 Patients with severe emphysema 4 Hypertension exceeds 160 100ml 5 Severe heart problems 6 Severe COPD Mild COPD...

Page 6: ...de 10 Muffler Silencer 11 Blank Port reserved for future upgrades 12 Automatic Pressure Relief Valves 4 PRODUCT SPECIFICATIONS AND CONSTRUCTION 2 AIR COMPRESSOR Voltage 110 220V Air Flow 72 L Minute P...

Page 7: ...LY AND OPERATION 4 Dehumidifier Voltage 110 220V Capability 150 L Minute Pressure 0 8mPa Power 300 Watt Weight 5kg 12 LPS Working Scheme Installation 1 Please open the accessory box before installatio...

Page 8: ...Note Please install internal and external pressure gauges before use the internal pressure gauge should be installed inside the chamber external pressure gauge should be installed outside the chamber...

Page 9: ...the oxygen generator 1 LPM below the maximum setting 2 Get into the chamber and pull outside zippers and then the inside zippers closed and make sure to flatten out the silicone strip between the zip...

Page 10: ...ally and stablize the pressure betwen 30 KPa and 32 KPa 5 It is recommended to use 40 80 mins per session Pressure gauge error tolerance 3 KPa 40 80mins 6 After use please open the Air Deflate Valve t...

Page 11: ...t time if there is slight discomfort or pain in your ears This is a normal phenomenon caused by pressure increase You can improve your discomfort by yawning chewing or swallowing You can also slow pre...

Page 12: ...ure has stabilized When a session is finished unscrew the air deflate valve slowly to depressurize the chamber the pressure will drop slowly from 30 KPa to 0 KPa this depressurization process should b...

Page 13: ...ssure and avoid the feeling of fullness in your ears you will need to clear your ears by chewing gum or food etc swallowing yawning During the pressurization of the chamber your mouth may become dry O...

Page 14: ...h intake 3 Air compressor screws loose 4 Internal parts loose 1 Air tube is leaking at the joint 2 Didn t close the air deflate valve or didn t tighten up 3 Did not close one of the Zippers completely...

Page 15: ...To help you choose the right Hyperbaric Chamber that fits your needs One of our hyperbaric specialists will assist you Please Call 630 451 8821...

Page 16: ...This page intentionally left blank...

Reviews: