background image

28

2.2 Personnel

Installation, maintenance and repair must only be carried out by
qualified tradesmen.

Due  to  his  professional  training,  knowledge  and  experience  as
well as his knowledge of the relevant standards and regulations,
the 

qualified gas and water specialist 

is in a position to carry

out any work at heating installations (solar plants) and to recognize
possible danger.

Due  to  his  professional  training,  knowledge  and  experience  as
well as his knowledge of the relevant standards and regulations,
the 

qualified electrician

is in a position to carry out any work at

electrical installations and to recognize possible dangers.

Due  to  his  professional  training,  knowledge  and  experience  as
well as his knowledge of the relevant standards and regulations,
the 

qualified roofer

is in a position to carry out any work at the

roof construction/roofing and to recognize possible dangers.

2.3 Possible dangers at the installation location

The case of an external fire was not taken into consideration when
constructing the flat-plate collector.

2.4 Other valid documents

– Apart from the operating instructions of the collector, the below

mentioned  operating  instructions  of  the  complete  solar  plant
should be observed. Notes included in these instructions – es-
pecially the safety notes – must be observed!

– BDH information sheet no. 17 “Thermal solar plants”, parts 1, 2

and 3

– BDH information sheet no. 27 “Solar heating support” parts 1

and 2

– Pump operating instructions
– Controller operating and installation instructions
– Controller general functional description
– Controller hydronic schemes
– Storage cylinder operating and installation instructions 
– Diaphragm  expansion  tank  operating  and  installation  instruc-

tions

– Operating and installation instructions of other components of

the heating system

– Further information on the internet:

– www.oventrop.com
– www.bdh-koeln.de

2.5 Important  standards,  rules  and  EC  directives  for  the  in-

stallation of solar collectors

DIN EN 12975-1 

Thermal solar plants and their components -

Collectors - Part 1: General specifications

– DIN EN 12976-1 

Thermal solar plants and their components 

Preassembled plants - Part 1: General specifications

– DIN V ENV 12977-1 

Thermal solar plants and their components

- Customized plants - Part 1: General specifications

– DIN  1055-4 

Impacts  on  structural  framework  -  Part  4:  Wind

load 

– DIN  1055-5 

Impacts  on  structural  framework  –  Part  5:  Snow

and ice load 

– DIN 18421 

Insulation and wirings of technical plants

– DIN 18382 

Electrical cabling in buildings

– DIN VDE 0185 

Lightning protection plants

– DIN VDE 0100 

Installation of power plants up to 1000V

– DIN 18338 

Roof tiling and roof insulation work

– DIN 18339 

Plumbing

Current standards and guidelines must be observed.

3  Transport, storage and packaging

3.1 Transport inspection

Upon  receipt  check  delivery  for  any  damages  caused  during
transit.
Any damage must be reported immediately upon receipt.

3.2 Storage and handling

Information regarding storage of collectors in open air

Lay down collectors with the pane facing upwards. Please don’t
cover the solar panels when they are placed outside. Glass corro-
sion may develop from condensate water (e.g. under a foil). Avoid
direct ground contact (put timber beams underneath). Avoid scrat-
ches on the panes by separating the collectors with spacers (e.g.
wood battens). When leaning the collectors against walls or similar,
please keep a minimum inclination angle of 15° and use spacers.
Do not use cardboard as intermediate layer.
If  incorrectly  stored,  humidity  may  penetrate  through  the  vent
holes.

Range and limits of application

The  collector  is  designed  for  use  in  thermal  solar  plants  for  hot
water  preparation  and  support  of  the  heating  system.  Water
(Attention: Risk of frost!) or a water and glycol mixture are to be
used  as  operating  fluid  in  a  closed  circuit.  Operational
conditions  leading  to  a  long-term  reduction  of  the  dew  point  in
the collector are inadmissible. This can be the case if collectors
are directly integrated into the brine circuit of a heat pump.

Thermal protection

To  avoid  damage  to  the  solar  circuit,  the  technical  information
“Thermal protection” must be observed for the vertical installation
of 4 or more OKF collectors with antireflective glass as well as for
central roof heating systems.

Frost damage

Collectors cannot be drained off completely after having pressuri-
sed and flushed the system. Do not leave pure water in the collector
where there is a risk of frost!

Mounted unfilled collector

Completely mounted and unfilled collectors must only be exposed
to the sun for a few days to avoid damage to the seals. Alternatively
only install seals before filling.

Diffusion of vapour for integrated roof installations

In case of roof integration, the area below the collector field must
be  protected  from  rising  humidity  and  airlocks  (foil  with  vapour
diffusion  barrier,  sufficient  ventilation  of  the  roof  underneath  the
collectors).

Disposal

The  collector  contains  hazardous  waste.  Dismounted  collectors
can be returned to the manufacturer Oventrop. They will be dis-
posed of professionally.

Risk of injury!

Improper use may lead to extensive injuries to persons and da-
mage to property. 
For this reason:
– Any work must only be carried out by qualified persons.

WARNUNG

!

Risk of injury! 

Suitable transport and lifting devices are to be

used. Wear suitable protective clothing (e.g. safety shoes) du-
ring installation and use safety devices.

Hot and cold surfaces!
Risk of injury! 

Do not touch without safety gloves. 

Sharp edges!
Risk of injury! 

Only touch with safety gloves. Threads, bore

holes and edges are sharp. 

Small components!
Risk of ingestion! 

Store and install small components out of

reach of children.

Allergies!
Health  hazard! 

Do  not  touch  the  collector  and  avoid  any

contact if allergies against the used materials are known.

WARNING

!

Summary of Contents for OKF-MQ25

Page 1: ...6148080 07 2016 OVENTROP GmbH Co KG Paul Oventrop Stra e 1 D 59939 Olsberg Telefon 49 0 2962 82 0 Telefax 49 0 2962 82 400 E Mail mail oventrop de Internet www oventrop com Eine bersicht der weltweite...

Page 2: ...ische Kabel und Leitungsanlagen in Geb u den DIN VDE 0185 Blitzschutzanlagen DIN VDE 0100 Errichten von Starkstromanlagen bis 1000V DIN 18338 Dachdeckungs und Dachabdichtungsarbeiten DIN 18339 Klempne...

Page 3: ...diffusionsdichte Unterspannbahn ausreichende Hinterl ftung des Daches unter den Kollektoren Entsorgung Der Kollektor unterliegt der Sonderm llbehandlung Demontierte Kollektoren werden vom Hersteller z...

Page 4: ...elnr 25l Kanister 136 16 91 OV Artikelnr 1 E 2 5 10 EURO L 0 50 100 150 200 250 300 350 400 0 5 10 15 20 25 30 35 40 Druckverlust mbar EURO L4 EURO L40 EURO L40 EURO L4 Abb 7 Druckverluste f r verscha...

Page 5: ...Kollektorband mit wechselseitigem Anschluss bei V 35 l m2 h spezifischer Volumenstrom Kollektorband mit einseitigem Anschluss bei bei V 35 l m2 h Parallelverschaltung von Kollektorb ndern bei V 35 l m...

Page 6: ...e vormontiert 2 215 mm 2 3 Kollektorhalter MQ25 2 4 Anschlussset OKF MQ25 2 5 Kollektoranschlussschlauch isoliert 900 mm 2 6 Kollektor nicht im Lieferumfang enthalten Abb 11 Montage des Dachankers Der...

Page 7: ...ungsset Aufdachmontage Pos Bauteil Anzahl 1 Dachanker Anzahl je nach Statik 4 6 2 Kollektoraschiene vormontiert 2 215 mm 2 3 Schienenverbinderset 2 4 Kollektorhalter MQ25 2 5 Verbindungsset OKF MQ25 2...

Page 8: ...lektor Einsatzgrenze siehe Tabelle Auslegungsbeispiele f r Schnee Windlastzone 1 2 Geb udeh he m H he ber NN m Aufdachmontage Anzahl Dachanker Kollektor 10 400 4 10 800 6 10 20 400 4 10 20 800 6 45 Ne...

Page 9: ...9 Verbinden von Grund und Erweiterungsset 30 Nm 3 3 17 Nm 2 1 Abb 14 Grund und Erweiterungsset verbinden...

Page 10: ...15 Kollektoranordnung Es ist darauf zu achten dass die Warnschilder des ersten sowie des letzten Kollektors nach innen liegend montiert sind Dies gew hrleistet dass in keinem Absorberbereich die Solar...

Page 11: ...tage des ersten Kollektors Kollektorklemme leicht l sen Anschlie end an Kollektor heranschieben und festziehen 17 Nm Falsch oder schlecht positionierte Kollektorklemmen k nnen einen ungen genden Halt...

Page 12: ...age des n chsten Kollektors 30 Abb 18 Nach dem 6 Kollektor ca 30mm Dehnungsab stand zu den dar auffolgenden Kol lektoren einhalten Hierf r l ngeren Feldkompensator Art Nr 136 14 48 gesondert bestellen...

Page 13: ...uteil Anzahl 1 OKF MQ25 Aufstelldreieck 2 2 Schraube M8x40 2 3 Mutter M8 mit Sperrverzahnung 2 4 Klemmwinkel 4 5 Unterlegscheibe 8 4 4 6 Schraube M8x40 4 7 OKF MQ25 Kollektorschiene vormontiert 2 215...

Page 14: ...1 OKF MQ25 Aufstelldreieck 1 2 Schraube M8x40 1 3 Mutter M8 mit Sperrverzahnung 1 4 Klemmwinkel 4 5 Unterlegscheibe 8 4 4 6 Schraube M8x40 4 7 OKF MQ25 Kollektorschiene vormontiert 2 215 mm 2 8 Schien...

Page 15: ...der Aufstelldreiecke Abb 21 Aufstelldreieck aufklappen und fixieren 1 0 5 0 1190 M gliche Aufstellwinkel A B Abb 22 m gliche Aufstellwinkel C mm A mm OKF MQ25 35 55 35 12 879 40 110 952 45 224 1 018...

Page 16: ...16 max 200 max 200 Position der Bodenfixierung Abb 23 Ma angaben der Auflager berst nde Montage auf Stahltr gern Abb 24 Befestigung der Aufstelldreiecke auf Stahltr gern...

Page 17: ...17 1 2 Montage auf Betonsteinen Abb 25 Befestigung der Aufstelldreiecke auf Betonsteinen Montage auf Kiesplattensets Abb 26 bersicht Aufstelldreiecke f r zwei Kollektoren auf Kiesplattensets...

Page 18: ...3 3 4 Abb 27 Befestigung der Aufstelldreiecke Bodenschiene im Bereich der St tzschiene beidseitig mit 4 Klemmwinkeln einfassen 3 Im vorderen Bereich 4 beidseitig mit 2 Klemmwinkeln befestigen Beim Bo...

Page 19: ...n Auslegungsbeispiele f r Schnee Windlastzone 1 2 Geb udeh he m H he ber NN m Freiaufstellung Auflasten kg m Kollektorfl che 10 400 90 10 800 90 10 20 400 120 10 20 800 120 45 Neigung ohne Ber cksicht...

Page 20: ...20 1 17 Nm 2 3 3 17 Nm Verbinden von Grund und Erweiterungsset Abb 29 Erweiterung des Montage Grundsets Mittleres Aufstelldreieck im Bereich der Sto fuge der Schienen positionieren...

Page 21: ...Abb 30 Kollektor und Aufstelldreiecke verbinden Kollektorklemme leicht l sen Anschlie end an Kollektor heranschieben und festziehen 17 Nm Falsch oder schlecht positionierte Kollektorklemmen k nnen ei...

Page 22: ...22 1 3 4 2 Montage des n chsten Kollektors Abb 31 Montage des n chsten Kollektors...

Page 23: ...32 Kollektoranordnung Es ist darauf zu achten dass die Warnschilder des ersten sowie des letzten Kollektors nach innen liegend montiert sind Dies gew hrleistet dass in keinem Absorberbereich die Solar...

Page 24: ...Abb 32 darauf achten dass sich beim Anziehen der Klemmringverschraubung der Anschluss am Kollektor nicht verdreht Abb 35 Stopfen Abb 34 Kollektorverbindung Ab dem 6 Kollektorfeld l ngeren Feldkompensa...

Page 25: ...e d rfen keine Fette oder le verwendet wer den da diese die Dichtungen zerst ren k nnen Schmutz partikel sowie Fett und lreste sind ggf aus den Zuleitun gen herauszusp len Bei der Auswahl des Betriebs...

Page 26: ...26 Notizen...

Page 27: ...packaging 28 4 Technical data 30 5 Rooftop installation 32 6 Freestanding installation 39 7 Collector connection and sensor installation 50 8 Operation 51 9 Maintenance 51 10 General terms and condit...

Page 28: ...for any damages caused during transit Any damage must be reported immediately upon receipt 3 2 Storage and handling Information regarding storage of collectors in open air Lay down collectors with th...

Page 29: ...red collector is exposed to sunlight Remove protection caps from the connections as soon as the collector is exposed to sunlight Risk of melting Collectors must not be installed with protective foil W...

Page 30: ...elded Fluid Tyfocor LS 10l canister 136 16 90 OV item no 25l canister 136 16 91 OV item no 1 E 2 5 10 EURO L 0 50 100 150 200 250 300 350 400 0 5 10 15 20 25 30 35 40 Druckverlust mbar EURO L4 EURO L4...

Page 31: ...ectors Collector field with two way alternate connection at V 35 l h h specific volume flow Collector field with one way connection at V 35 l m h Parallel connection of collector fields at V 35 l m h...

Page 32: ...llector rail OKF MQ25 pre assembled 2 215 mm 2 3 Collector bracket OKF MQ25 2 4 Connection set OKF MQ25 2 5 Collector collection hose insulated 900 mm 2 6 Collector Not included Illustr 11 Installatio...

Page 33: ...n set rooftop installation Pos Component Number 1 Roof anchor number depending on statics 4 6 2 Collector rail OKF MQ25 pre assembled 2 215 mm 2 3 Rail connection set 2 4 Collector bracket MQ25 2 5 Co...

Page 34: ...imits see table Design examples for snow and wind load zone 1 2 Height of building m Height above sea level m Rooftop installation number of roof anchors per collector 10 400 4 10 800 6 10 20 400 4 10...

Page 35: ...35 Connection of basic and extension set 30 Nm 3 3 17 Nm 2 1 Illustr 14 Connection of basic and extension set...

Page 36: ...ollector Illustr 15 Arrangement of collectors It is to be observed that the warning labels of the first and the last collector face inwards This way the stagnation and overheating of the solar liquid...

Page 37: ...1 X Illustr 16 Installation of first collector Loosen collector clamp slightly push towards the collector and tighten 17 Nm If the collector clamps are placed incorrectly the collector will not be se...

Page 38: ...tor Installation of next collector 30 Illustr 18 Provide an expansion distance of approx 30 mm after the 6th collec tor A longer com pensator is required for this purpose item no 136 14 48 The exact a...

Page 39: ...stallation Pos Component Number 1 Mounting triangle OKF MQ25 2 2 Screw M8x40 2 3 Nut M8 with locking serration 2 4 Clamping bracket 4 5 Washer 8 4 4 6 Screw M8x40 4 7 Collector rail OKF MQ25 pre assem...

Page 40: ...t Number 1 Mounting triangle OKF MQ25 1 2 Screw M8x40 1 3 Nut M8 with locking serration 1 4 Clamping bracket 4 5 Washer 8 4 4 6 Screw M8x40 4 7 Collector rail OKF MQ25 pre assembled 2 215 mm 2 8 Rail...

Page 41: ...unting triangles Illustr 21 Setting up and fixing the mounting triangles 1 0 5 0 1190 Mounting angle options A B Illustr 22 Mounting angle options C mm A mm OKF MQ25 35 55 35 12 879 40 110 952 45 224...

Page 42: ...x 200 max 200 Position of the floor fixing devices Illustr 23 Dimensional specification of the support projections Installation on steel girders Illustr 24 Fixing of the mounting triangles on steel gi...

Page 43: ...1 2 Installation on concrete blocks Illustr 25 Fixing of the mounting triangles on concrete blocks Installation on gravel plates Illustr 26 Summary mounting triangles for two collectors on gravel plat...

Page 44: ...3 2 3 3 4 Illustr 27 Fixing the mounting triangles Fix 4 clamping brackets on both sides of the floor rail onto the support rail 3 In the front area fix 2 clamping brackets on both sides 4 Do not dama...

Page 45: ...snow and wind load zone 1 2 Height of building m Height above sea level m Freestanding installation loads kg m collector surface 10 400 90 10 800 90 10 20 400 120 10 20 800 120 45 inclination without...

Page 46: ...46 1 17 Nm 2 3 3 17 Nm Connection of basic and extension set Illustr 29 Extension of basic set Position middle mounting triangle near the joint of the rails...

Page 47: ...rst collector Illustr 30 Connection of collector and mounting triangles Loosen collector clamp slightly push towards the collector and tighten 17 Nm If the collector clamps are placed incorrectly the...

Page 48: ...48 1 3 4 2 Installation of next collector Abb 31 Installation of next collector...

Page 49: ...ollector Illustr 32 Arrangement of collectors It is to be observed that the warning labels of the first and the last collector face inwards This way the stagnation and overheating of the solar liquid...

Page 50: ...t the connection at the collector is not twisted while tightening the compression fitting Illustr 35 Plug Illustr 34 Collector connection Use a longer field compensator item no 136 14 48 after the 6th...

Page 51: ...n installing the valve as these may destroy the seals If necessary all dirt particles and lubricant or oil residues must be removed from the pipe work by flushing the latter When choosing the operatin...

Page 52: ...52 Notes...

Page 53: ...age et emballage 54 4 Donn es techniques 56 5 Montage en sur toiture 58 6 Montage sur ch ssis libre 65 7 Raccordement du capteur et montage de la sonde 76 8 Service 77 9 Entretien 77 10 Conditions g n...

Page 54: ...ansport stockage et emballage 3 1 Inspection apr s transport Examiner la livraison imm diatement apr s r ception pour v rifier l absence de dommages dus au transport Si des dommages ou d autres d faut...

Page 55: ...e accumulation d air pan de film plastique tanche la diffusion de vapeur a ration suffisante de l arri re du toit Elimination Le capteur n cessite un recyclage sp cial Les capteurs d mont s sont repri...

Page 56: ...er Fluide Tyfocor LS Bidon de 10l 136 16 90 R f OV Bidon de 25l 136 16 91 R f OV 1 E 2 5 10 EURO L 0 50 100 150 200 250 300 350 400 0 5 10 15 20 25 30 35 40 Druckverlust mbar EURO L4 EURO L40 EURO L40...

Page 57: ...e de capteurs avec raccordement bidirectionnel avec V 35 l m h d bit sp cifique Rang e de capteurs avec raccordement monodirectionnel avec V 35 l m h Montage en parall le de rang es de capteurs avec...

Page 58: ...capteur OKF MQ 25 pr mont 2 215 mm 2 3 Support de capteur OKF MQ25 2 4 Jeu de raccordement OKF MQ25 2 5 Tuyau de raccordement de capteur isol 900 mm 2 6 Capteur non joint la livraison Fig 11 Montage d...

Page 59: ...e en sur toiture Pos Composant Nombre 1 Crochet de toiture nombre selon statique 4 6 2 Rail de capteur OKF MQ 25 pr mont 2 215 mm 2 3 Jeu de raccords de liaison 2 4 Support de capteur OKF MQ25 2 5 Jeu...

Page 60: ...tableau Exemples de s lection pour zone de charge due la neige au vent 1 2 Hauteur du b timent m Altitude au dessus du niveau de la mer m Montage en sur toiture nombre de crochets de toiture par capt...

Page 61: ...61 Liaison du set de base et d extension 30 Nm 3 3 17 Nm 2 1 Fig 14 Liaison du set de base et d extension...

Page 62: ...15 Placement des capteurs Il faut veiller ce que les autocollants d avertissement du premier et du dernier capteur soient orient s vers l int rieur afin d viter une stagnation et la surchauffe du flu...

Page 63: ...ge du premier capteur Desserrer l g rement la bride de serrage la faire glisser en direction du capteur et la serrer 17 Nm Un positionnement mauvais ou incorrect des brides de serrage peut mener un ma...

Page 64: ...Montage du capteur suivant 30 Fig 18 Pr voir un cartement de dilation d environ 30 mm apr s le sixi me capteur Un com pensateur de dilata tion plus long est n cessaire cet effet r f 136 14 48 Respect...

Page 65: ...Pos Composant Nombre 1 Triangle de montage OKF MQ25 2 2 Vis M8x40 2 3 Ecrou M8 avec denture de blocage 2 4 Bride querre de serrage 4 5 Rondelle 8 4 4 6 Vis M8x40 4 7 Rail de capteur OKF MQ25 pr mont...

Page 66: ...e 1 Triangle de montage OKF MQ25 1 2 Vis M8x40 1 3 Ecrou M8 avec denture de blocage 1 4 Bride querre de serrage 4 5 Rondelle 8 4 4 6 Vis M8x40 4 7 Rail de capteur OKF MQ25 pr mont 2 215 mm 2 8 Raccord...

Page 67: ...es triangles Fig 21 D pliage et fixation des triangles 1 0 5 0 1190 Angles d inclinaison possibles A B Fig 22 Angles d inclinaison possibles C mm A mm OKF MQ25 35 55 35 12 879 40 110 952 45 224 1 018...

Page 68: ...68 max 200 max 200 Position du dispositif de fixation par sol Fig 23 Cotes des saillies des supports Montage sur poutres m talliques Fig 24 Fixation des triangles sur poutres m talliques...

Page 69: ...69 1 2 Montage sur support b ton Fig 25 Fixation des triangles sur support b ton Montage sur sets pour bacs gravier Fig 26 Vue d ensemble triangles pour deux capteurs sur sets pour bacs gravier...

Page 70: ...xation des triangles Fixer le rail de sol sur le rail de support des deux c t s avec 4 brides querres de serrage 3 Dans la zone avant 4 fixer des deux c t s avec 2 brides querres de serrage Ne pas ab...

Page 71: ...rge due la neige au vent 1 2 Hauteur du b timent m Altitude au dessus du niveau de la mer m Montage sur ch ssis libre Charges kg m surface de capteur 10 400 90 10 800 90 10 20 400 120 10 20 800 120 D...

Page 72: ...72 1 17 Nm 2 3 3 17 Nm Liaison du set de base et d extension Fig 29 Extension du set de base Positionner le triangle de montage du milieu proximit de l ouverture du joint des rails...

Page 73: ...g 30 Liaison du capteur et des triangles Desserrer l g rement la bride de serrage la faire glisser en direction du capteur et la serrer 17 Nm Un positionnement mauvais ou incorrect des brides de serra...

Page 74: ...74 1 3 4 2 Montage du capteur suivant Fig 31 Montage du capteur suivant...

Page 75: ...32 Placement des capteurs Il faut veiller ce que les autocollants d avertissement du premier et du dernier capteur soient orient s vers l int rieur afin d viter une stagnation et la surchauffe du flu...

Page 76: ...capteur ne soit pas d plac en serrant le rac cord serrage Fig 35 Bouchon Fig 34 Liaison des capteurs Apr s le sixi me capteur en s rie il faut monter un compensateur de dilatation plus long r f 136 14...

Page 77: ...Si n cessaire des impu ret s ou r sidus de graisse ou d huile doivent tre enlev s de la tuyauterie par rin age Choix du fluide de service selon la technologie actuelle par ex VDI 2035 Prot ger des nu...

Page 78: ...78 Notes...

Page 79: ...79 Notes...

Page 80: ...80...

Reviews: