
Figure 236, Page 5
OPERATION CHECKLIST
Operation Checklist
Before Operating:
After Operation
For a safe and pleasurable heating experience, perform this check before each use.
1. Gas control is in OFF position.
2. Gas tank valve is OFF.
3. LP/NG is disconnected.
4. After each use, cap on tank is replaced.
1. I am familiar with the entire owner’s manual and understand all precautions noted.
2. All components are properly assembled, intact and operable.
3. No alterations have been made.
4. All gas connections are secure and do not leak.
5. Wind velocity is below 16 km/h (10 mph).
6.
7. Fire pit is outdoors (outside any enclosure).
8. There is adequate fresh air ventilation.
9.
10. Fire pit is away from windows, air intake openings, sprinklers and other water sources.
11. Fire pit is at least 90 cm (36 in) on rear and at least 90 cm (36 in) on sides from combustible materials.
12. Fire pit is on a hard and level surface.
13. There are no signs of spider or insect nests.
14. All burner passages are clear.
15. All air circulation passages are clear.
16. Children and adults should be alerted to the hazards of high surface temperatures and should keep
away to avoid burns or clothing ignition.
17.
18.
19. Any guard or other protective device removed for servicing the fire pit must be replaced prior to
20. Installation and repair should be done by a qualified service person. The fire pit should be
21. More frequent cleaning may be required as necessary. It is imperative that control burner and
22. Do not use this appliance if any part has been under water. Immediately call a qualified service
technician to inspect the appliance and to replace any part of the control system and any gas control
that has been under water.
Summary of Contents for 1902301
Page 1: ...11 236 1 1902301 OVE r 1 866 839 2888 2800 rue tienne Lenoir Laval Qu bec H7R 0A3 Canada...
Page 2: ...ANSI Z21 97 2014 ANSI Z233 1 NFPA 54 CSAB149 1 B149 2 236 2...
Page 3: ...236 3 ANSI NFPA 58 DANGER 90 3 90 3 1 8 6...
Page 4: ...236 4 ANSI Z233 1 CANADA CAN CGA B 149 2 CO CO...
Page 6: ...236 6 4 x 2...
Page 7: ...1 2 236 7...
Page 8: ...3 4 236 8 20 LBS...
Page 9: ...5 236 9 6...
Page 11: ...1 50 50 2 OFF 3 4 A B C D E F G H 5 A H 6 7 8 OFF 9 10 11 12 236 11 60...
Page 12: ...1 x 7 AAA 236 12...
Page 13: ...1 2 3 236 13...
Page 15: ...ON OFF ON ON 4 4 40 1 4 236 15...
Page 16: ...1 2 1 2 3 1 2 3 4 5 6 7 8 9 1 2 3 4 OFF OFF 236 16...
Page 26: ...ASSEMBLY INSTRUCTIONS FOR LP Figure 236 Page 9 Step 5 Step 6...
Page 29: ...BATTERY INSTALLATION 1x AAA Battery included Figure 236 Page 12...
Page 30: ...STORAGE FOR TABLE COVER Step 1 Step 2 Step 3 Figure 236 Page 13...