background image

1

SAFETY ADVICE

We strongly recommend the use of work gloves during assembly.
Do not attempt to assemble the greenhouse in windy or wet conditions,
Do not touch overhead power cables with the aluminum profiles.
Always wear shoes and safety goggles when working with extruded aluminum.
Dispose of all plastic bags safety-keep them out of reach of small children.
The greenhouse must be positioned and fixed on a flat level surface.
Do not lean against or push the greenhouse during construction.
Keep children away from the assemble area.
Do not position your greenhouse in an area exposed to excessive wind.
Do not attempt to assemble this greenhouse if you are tired ,have taken drugs or 
alcohol or if you are prone to dizzy spells.
If using a step ladder or power tools ensure that you follow the manufactures safety 
advice.
Hot items such as recently used grills, blowtorches etc.must not be stores in the 
greenhouse.
Ensure there are no hidden pipes or cables in the ground before inserting the pegs.

GENERAL ADVICE

This is a multi-part assembly, Allow at least 30 minutes for assembly.
Selecting a site-choose a sunny level position away from overhanging trees.
If you are fixing your greenhouse directly to a solid concrete foundation use the pre 
drilled holes in the metal base supplied.
The component parts should be checked and laid out close at hand.
Keep all small parts(screws etc)in a bowl so they do not get lost.
Note that the door is hinged on the right hand side and therefore opens to the right. 
Keep roof clear of snow and leaves.

CARE & MAINTENANCE

When your greenhouse needs a clean, use a mild detergent solution and risen with 
cols clean water.
Do NOT use acetone, abrasive cleaners or other special detergents to clean the 
clear panels.

TOOLS & EQUIPMENT REQUIRED

Silicone sealant & applicator bradawl crosshead screwdriver step ladder.
Tape measure large hammer scissors Work gloves Drill spirit level Lubricant see 
over for cantents plastic or rubber mallet 0.08" metal drill bit If help is required seek 
professional advise within store.

EN

Summary of Contents for 845-329

Page 1: ... not tighten the steps in the greenhouse until completing on the assembly of the polycarbonate panels Keep these instructions in a safe place for future reference DE_WICHTIG Sie müssen diese Anleitung sorgfältig durchlesen bevor Sie mit der Montage dieses Gewächshauses beginnen Bitte stellen Sie sicher dass Sie alle Teile im Karton in der richtigen Art und Menge finden wie in der auf jeder Seite ab...

Page 2: ...ere are no hidden pipes or cables in the ground before inserting the pegs GENERAL ADVICE This is a multi part assembly Allow at least 30 minutes for assembly Selecting a site choose a sunny level position away from overhanging trees If you are fixing your greenhouse directly to a solid concrete foundation use the pre drilled holes in the metal base supplied The component parts should be checked and...

Page 3: ...abel im Boden befinden bevor Sie die Heringe einsetzen ALLGEMEINE HINWEISE Dies ist eine mehrteilige Installation Bitte erlauben Sie mindestens 30 Minuten für die Montage Wählen Sie bei der Auswahl eines Standorts eine sonnige und ebene Position entfernt von überhängenden Bäumen Wenn Sie Ihr Gewächshaus direkt auf einem soliden Betonfundament befestigen verwenden Sie bitte die vorgebohrten Löcher i...

Page 4: ...3 PART L I S T ...

Page 5: ...4 01 ...

Page 6: ...5 02 ...

Page 7: ...hraube in die Nut und drehen Sie sie im Uhrzeigersinn bis zum Anschlag Stellen Sie nun die Sechskantschraube von Hand ein und drehen Sie sie so dass sie mit dem Gewinde befestigt ist Setzen Sie die anderen Teile auf die Sechskantschraube und montieren Sie die Mutter ...

Page 8: ...7 04 ...

Page 9: ...8 05 ...

Page 10: ...9 06 ...

Page 11: ...10 07 ...

Page 12: ...11 08 ...

Page 13: ...12 09 ...

Page 14: ...13 D o n e ...

Reviews: