13
Step 2. Installing the brackets
Drill the hole according to the line which was draw up in step 1 by 14mm( or 5/8 inch) wall drill, please pay attention to the
deep of hole that should not be less than 9cm. Making the expansion bolt through the bracket(keep the barbed side up),
hitting the expansion bolt into the hole with tighten by wrench. As shown in the figure below:
Or 5/8inch
Step 3: Installing the awning:
Install the awning into the brackets, and fasten the bolts of the brackets.
As shown in the figure below:
Step 4: Open the arms
After locking the awning, please close the awning by hand crank, then cut the strings which raping the
arms.
Attention, the strings can't be cut before !!
Step 5: Adjust the front bar
Open the awning totally, and check whether it is horizontal and adjust the height of the front bar you need. Please noted
the height between floor and front bar should be more than 2.5m. As shown in the figure: