70.
Place 1st
Roof Ridge Cap
on roof peak overhanging shingles by
aprroximatley 1”. Attach with
2 - 1 1/2” Shingle Nails
9” from end. Place
2nd Ridge Cap 1” back from first cap. Attach with
2 - 1 1/2” Shingle
Nails
9” from end. Alternate each Ridge Cap seam as you proceed.
Parts (Steps 70-71)
Roof Ridge Caps x 16
Hardware (Steps 70-71)
N2
- 1 1/2” Shingle Nails
x 32 total
Alternate Ride Cap seams (offsetting angle cut at peak)
Important:
Butt (thick) end
of Ridge Cap will be facing
towards the outside of shed.
9” from end
Thin End
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 29
71.
Place 3rd
Ridge Cap
8” back from 2nd (enough to cover shingle nails). Attach 3rd Ridge Cap as
per
Step 70
. Continue to position and attach Ridge Caps until half the roof is complete. From opposite
side, position and attach Ridge Caps as described above. One Ridge Cap is cut shorter to fit in the cen-
ter of the roof. Attach center cap with
4 - 1 1/2” Shingle Nails
.
8
”
8
”
72.
Attach
Door Hinges
to
Door Panel
as shown
above. Position Hinges equally on Door Trim as
shown above and attach with
1 -3/4” Black Screw
and 2 - 2” Black Screws
per hinge.
Parts (Steps 72)
Door
(31 1/2” x 72”)
x 1
Hardware (Steps 72)
SB1 - 3/4” Black Screws
x 3 total
SB2 - 2” Black Screws
x 6 total
Y1 - Tee Hinges
x 3 total
2” Screws
3/4” Screw