47.
Place
Roof Panel
so it sits flush on 3rd rafter from the outside (doubled up rafter). Plywood on
roof should be flush with end of rafter at bottom. From the outside, screw down through bottom row of
shingles into rafter with
1 - 2 1/2” screw
. Angle a
2 1/2” screw
from outside rafter into roof plywood.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 20
1 - 2 1/2” Screw in
Bottom Row of Shingles
Roof Plywood flush
with rafter end.
46.
Identify Roof Panels. There are 2 Rear and 2
Front Roof Panels. Starting with a
Right Rear
Roof Panel
, lift up and place on rafters.
Shingles and
plywood flush
at center.
Right Rear
Roof Panel.
Parts (Steps 46)
Roof Panels
(51” wide)
x 4
Hardware (Steps 46)
S1
- 2 1/2” Screws
x 8 total
Shingles overhang
plywood on outside
panels.
Angle Screw from
Rafter into Plywood.
48.
Locate
Right Front Roof Panel
(roof plywood flush with shingles on inside, shingles overhanging
plywood on outside) and place on Rafters. Aligh Panels as per
Step 47
and screw panel down to rafter with
1 - 2 1/2” screw
in the bottom row of shingles. Angle a
2 1/2” screw
from outside rafter into roof plywood.
1 - 2 1/2” Screw.