20
4.8 Measuring Resistance and Measures’ Table
- The master electrician who installed and connected the
Therma Cable
system
must complete the measures’ table (this label is available at the opening of the
product) and give it to the customer. This sheet must be kept near the
electrical service.
If this table is not duly completed, the warranty may be annulled. Warranty
terms are set out in Section 8.
4.9 Using the Therma Cable System
- The
Therma Cable
floor heating system is now ready for use. However, before
turning on the system, make sure the curing period specified by the cement or
binder manufacturer has expired. Adjust the thermostat's temperature based
on your needs and desired level of comfort.
CAUTION!
Summary of Contents for Therma Cable
Page 1: ...INSTALLATION GUIDE October 2009 Edition...
Page 2: ......