5
Step 3 Dissasemble Gauge
d.
Unscrew and remove the sight glass from the gauge.
e.
Remove the steel wire assembly from the bushing by
gently pulling it upward while holding the bushing.
b
c
Step 1 Inspect for Defects
a.
Prior to installation, verify that the gauge is free
of any defects that may affect performace such as bent
metal wires, or the arm of the gauge does not rotate
freely...etc. If a defect is found, do not install.
Please contact your distributor for a replacement.
Step 2 Install Away from Obstacles
b.
The gauge must be installed with ample distance from
the tank wall so the gauge's rotating arm does not hit the
sides of the tank from within.
c.
Likewise, the gauge must rotate away from the fill
openings. It should never rotate directly under as the pipes
within the tank may hinder the movement of the gauge's
rotating arm.
F
3/4
1/2
1/4
0
Part 1.2 Installing a New Compatible Granby Float Gauge
Skip to Part 2 (page 6) if a compatible float is already installed.