1270464_1
2
EN | Installation
Installation of connection box for HERU 70 K
Product description
The connection box is wall mounted to simplify the installation of HERU 70 K.
The connection box is condensation insulated, and is available in either
right-hand or left-hand design for HERU 70 K. Duct connections 4x125 mm.
Preparations:
• Lift the connection box out of the carton.
1 Leave the pre mounted duct insulations in place.
• The ducts for fresh and exhaust air must always be insulated against condensation.
• The ducts must be insulated all the way up to the connection box.
2 Dismount HERU unit’s front cover for easier handling.
3 Remove the HERU unit’s wall console and associated screws.
They will not be needed.
No other preparations are required.
NOTE! All operations on the HERU unit must be performed
according to the manual for HERU 70 K.
Tools:
• Screwdriver
Material:
• Fasteners that are suitable for the construction and condition of the wall
• Condensation insulation for fresh and exhaust air ducts
Mount the connection box.
• The duct connections of the connection box must
be downwards.
4 Measure the height on the wall where
the connection box is to be mounted.
Bottom edge of the fi tting with slotted groove
= top edge of the HERU unit.
5 Fasten a screw in the slot grooves on the lower fi tting.
Adjust the height.
6 Secure the upper fi ttings.
7 Secure the lower fi ttings.
• Mount the ducts to the connection box
and insulate the fresh and exhaust air ducts.
1
3
2
4
6
7
5
1270464_utg1_Connectionbox_HERU_K_Installation_EN_SE_NO.indd 2
2020-11-03 09:54:17
1270464_utg1_Connectionbox_HERU_K_Installation_EN_SE_NO.pdf 2
1270464_utg1_Connectionbox_HERU_K_Installation_EN_SE_NO.pdf 2
2020-11-03 10:01:17
2020-11-03 10:01:17