SECTION 4 - BOOM & PLATFORM
3121784
4-15
4.7
LOAD CELL AND FOOTSWITCH REMOVAL/
INSTALLATION
Removing Load Cell
1.
Turn the machine off and unplugged from the
power supply.
2.
Remove the basket of the
machine (see dismantling basket).
3.
Remove screws (2) and remove cover (3).
4.
Remove the load cell (4) by disconnecting
the wiring from ECM3.
Installing Load Cell
1.
Install the load cell (4) and stop with cover
(3) and secure with screws (2).
2.
Remount the load cell (4) connecting
the electrical wiring to ECM3.
3.
Reinstall the
basket. (See section basket installation)
Figure 4-12.
Removing Footswitch
1.
Turn the machine off and unplugged from the
power supply.
2.
Remove the basket of the machine. (See
paragraph basket removal).
3.
Remove screws (5) securing support footswitch (6).
4.
Loosen the fixing screw foot (1).
5.
Remove the footswitch (1) disconnecting
the wiring from ECM3.
Installing Footswitch
1.
Fit and secure with screw the the footswitch
(1) to the support footswitch (6).
2.
Secure with screws (5) footswitch support (6) to
the basket support(7).
3.
Connect the wiring to ECM3.
4.
Reinstall the basket. (See
paragraph basket installation).
Go
to
Discount-Equipment.com
to
order
your
parts