Index
1
31211368
A
Accessory Control Lever............................ 3
Additional Checks ..........................................8
Adjusting/Moving Forks ........................... 5
After-Treatment System...............................4
Air Cleaner...................................................... 7
Air Conditioning System..............................9
Air Shutoff Valve Test....................................8
Approved Attachments................................5
Attachment Installation
Hydraulic Coupler ................................ 5
Mechanical Coupler............................. 5
Attachment Operation .............................. 5
Attachments.....................................................5
JLG Supplied .............................................5
Automatic Exhaust System
Cleaning (In-Mission) ....................................4
Auxiliary Hydraulic Decompression...... 5
Axles....................................................................9
B
Battery Boosted Starting..............................4
Boom Indicator
Angle......................................................... 3
Extension................................................. 3
Boom Mounted Lifting Lug...................... 5
Boom Ride Control...................................... 3
Brake Fluid..............................................7
Bucket.............................................................. 5
Bucket - Fork Mounted.............................. 5
C
Cab Air Filters................................................ 7
Capacity .......................................................... 5
Capacity Chart
Example ................................................... 5
Sample ..................................................... 5
Capacity Indicator Locations................... 5
Carriage w/Forks.......................................... 5
Chemical Hazards........................................ 1
Controls..............................................................3
Coolant Level ................................................ 7
Cooling System ...............................................9
Coupler Mounted Hook ............................ 5
D
DEF Tank............................................................9
Dimensions.................................................... 9
Disengaging a Load.................................... 4
Disengaging a Suspended Load............ 4
Driving Hazards on Slopes....................... 1
Dual Fork Positioning Carriage............... 5
E
Electrical Hazards ...........................................1
Emergency Exit from Enclosed Cab.........6
Emergency Lowering of Boom..................6
Emergency Procedures ................................6
Engine
Extreme Cold Weather Starting .........4
Normal Operation...................................4
Starting .......................................................4
Engine Crankcase Oil.....................................9
Engine Oil Level ........................................... 7
Exit .......................................................................6
Index
https://www.forkliftpdfmanuals.com/