3. Mounting instructions
Ortlieb Präzisionssysteme GmbH & Co. KG • Jura Str. 11 • 73119 Zell u. Aichelberg • Germany
9
Tel.: +49 (0) 7164 79 701-0 • Fax.: +49 (0) 7164 79 701-51 • e-mail: [email protected] • www.ortlieb.net
3.1 Check run-out
To provide best possible run-out results, it is necessary to adjust the clamping device. Therefore
loose the mounting screws between chuck and machine spindle. Check the TIR with a dial
indicator in the taper of the pressure sleeve. After adjusting the chuck, do not forget to retighten the
mounting screws with the proper torque.
TIR-check acc. DIN 6343
Clamping diameter
length
Standard
High-
ØD [mm]
L [mm]
accuracy
accuracy
4
-
6
16
0,020
0,015
6
-
10
25
0,020
0,015
10
-
18
40
0,020
0,015
18
-
24
50
0,030
0,020
24
-
30
60
0,030
0,020
30
-
50
80
0,040
0,030
50
-
65
100
0,040
0,030
3.2 Change the collet
-
Move lever in release position (rear)
-
Remove the cap
-
Remove the collet
-
Clean the collet carrier, regrease slightly
-
Insert collet
-
Screw the cap onto the main body
up to the back-stop
-
Check clamping; eventually turn the cap in
reverse direction
(cap is locked by a detent)
Important:
Please pay attention to a clean collet-carrier, free of dirt and chips, especially when the collet is
changed. Only use intact, clean and slightly greased collets. Before operation, make sure the cap
is locked by the detent!