
OPERATION AND FIELD SETTINGS
1TRIPR II Row Units OM-EN
5-11
Rolling Basket Down Pressure
An optional rolling basket assembly is available to
complement the 1tRIPr® II Row Unit. Rolling baskets
reduce clod size to decrease soil variability, retain
existing soil moisture, and complete the optimum
seedbed. Rolling baskets are mounted to the rear of the
row unit tail section. See “Rolling Basket Assembly
Installation” on page 4-8.
Rolling Basket Down Pressure Adjustment
DANGER
!
Avoid crushing. Failure to follow this information will
result in death or serious injury. Make sure all personnel
are clear of the implement before lowering.
DANGER
!
Avoid crushing. An uneven surface could cause the
implement to shift or fall, resulting in injury or death as
well as implement damage. Park the implement on a
clean, dry, level surface.
DANGER
!
Avoid crushing. Failure to follow this information will
result in death or serious injury. Use bar stands and
cylinder stops to support the implement.
1. Lower the implement to the ground, place the tractor
in park, turn off the engine, and remove the key.
2. Remove buildup of grease, oil, and debris prior to
adjusting rolling basket down pressure. See
“Implement Inspection” on page 7-4.
CAUTION
!
Be extremely careful working around unshielded sharp
edges. Injury may result from contact with sharp edges.
3. Loosen jam nut (2) and adjust tension nut (3) as
desired.
NOTE:
Tighten tension nut to increase the spring tension,
creating more rolling basket (6) down pressure.
Loosen tension nut to decrease the spring
tension, reducing the rolling basket down
pressure.
4. Tighten jam nut and torque to specification. See
“Torque Specifications” on page 7-2.
ORM000284
Figure 5-7
Tools
• 3/4 in Wrench
• 1-1/2 in Wrench
1) Hex nut
4) Washer
2) Jam nut
5) Spring
3) Tension nut
6) Rolling basket
5
3
2
1
4
6
Summary of Contents for 125-082-01-EN-OM
Page 1: ...Operator s Manual 1TRIPR II ROW UNITS Part 125 082 01 EN OM Rev A ...
Page 2: ...Intentionally Left Blank Page ...
Page 6: ...1TRIPR II Row Units OM EN TOC iv Page Intentionally Blank ...
Page 22: ...SAFETY INFORMATION 1TRIPR II Row Units OM EN 2 12 Page Intentionally Blank ...
Page 28: ...MAJOR COMPONENTS 1TRIPR II Row Units OM EN 3 6 Page Intentionally Blank ...
Page 70: ...OPERATION AND FIELD SETTINGS 1TRIPR II Row Units OM EN 5 24 Page Intentionally Blank ...
Page 74: ...TROUBLESHOOTING 1TRIPR II Row Units OM EN 6 4 Page Intentionally Blank ...
Page 82: ...MAINTENANCE AND SPECIFICATIONS 1TRIPR II Row Units OM EN 7 8 Notes ...