
PREPARATION AND SETUP
1TRIPR II Row Units OM-EN
4-18
7. Remove bolt (10) and pin (9) from AR trip linkage
package.
8. Remove lower bolts (12), spring pins (11), and pin
(13) from AR trip linkage package.
ORM000292
Figure 4-20
9. Position the AR trip linkage assembly (14) over the
main frame (15) and align pin holes.
10. Insert pin (9) and bolt (10).
11. Lower the AR trip linkage assembly into the tail
section (16) and align pin holes.
12. Insert pin (13) and spring pins (11).
13. Align springs and insert bolts (12).
ORM000293
Figure 4-21
14. Insert bolts (1), jam nuts (2), and left down-pressure
spring (3), see Figure 4-19 on page 4-17.
CAUTION
!
Avoid injury. Springs are under tension. Adjust spring
tension slowly. Failure to follow this information will
result in serious injury.
15. Tighten spring tension bolts to factory settings. See
“Automatic Reset (AR) Trip Linkage” on page 5-21.
9) Pin
12) Bolt (4 used)
10) Bolt
13) Pin
11) Spring pin (2 used)
9
10
11
12
13
9) Pin
13) Pin
10) Bolt
14) AR trip linkage assembly
11) Spring pin (2 used)
15) Main frame
12) Bolt (4 used)
16) Tail section
9
11
12
13
14
10
15
16
Summary of Contents for 125-082-01-EN-OM
Page 1: ...Operator s Manual 1TRIPR II ROW UNITS Part 125 082 01 EN OM Rev A ...
Page 2: ...Intentionally Left Blank Page ...
Page 6: ...1TRIPR II Row Units OM EN TOC iv Page Intentionally Blank ...
Page 22: ...SAFETY INFORMATION 1TRIPR II Row Units OM EN 2 12 Page Intentionally Blank ...
Page 28: ...MAJOR COMPONENTS 1TRIPR II Row Units OM EN 3 6 Page Intentionally Blank ...
Page 70: ...OPERATION AND FIELD SETTINGS 1TRIPR II Row Units OM EN 5 24 Page Intentionally Blank ...
Page 74: ...TROUBLESHOOTING 1TRIPR II Row Units OM EN 6 4 Page Intentionally Blank ...
Page 82: ...MAINTENANCE AND SPECIFICATIONS 1TRIPR II Row Units OM EN 7 8 Notes ...