
PAGE: 601
MAR 30/2020
INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AF / AF-H / AF (6D)
© 2020 Orolia S.A.S. All rigths are strictly reserved.
SERVICING
1. Maintenance Schedule
A. Periodic inspection
NOTE: (if required by the relevant Civil Aviation Authority).
Some Civil Aviation Authorities may require the ELT is tested periodically. In
this case, Orolia S.A.S. recommends the check of the following parameters:
• G-Switch activation.
• Battery voltage.
• 121.5 MHz / 243.0 MHz / 406.025 MHz transmission power.
• 121.5 MHz / 243.0 MHz / 406.025 MHz frequency.
• 121.5 MHz AM (sweep monitoring with VHF receiver).
• Number of 406 MHz transmissions (optional, programming kit required).
• Number of self-tests carried out (optional, programming kit required).
• Programmed data (optional, programming kit required).
NOTE: These checks can be carried out without opening the ELT.
These tests are described in Service Letter "SL S18XX502-25-12".
B. Battery replacement
Testing of the various elements of the ELT is mandatory when the battery is
replaced:
NOTE: For battery replacement intervals,
Refer to 2. Battery replacement
• Visual control of the housing and accessories;
• O-ring, battery and desiccant capsule replacement;
• Beacon Tightness;
• "Testing and Fault Isolation" procedure.
NOTE: For servicing instructions, refer to Service Letter SL S18XX50X-25-02
Maintenance Policy for KANNAD ELTs found on the Support section of Orolia
Website:
Battery replacement:
carried out by a PART 145 or FAR 145 (or equivalent) maintenance
station as described in Service Letter SL S18XX50X-25-02 Maintenance
Policy for KANNAD ELTs.
Periodic inspection:
depending if the ELT is opened or not, PART 145 or FAR 145 (or
equivalent) may be required. Refer to local regulations
Summary of Contents for KANNAD 406 AF
Page 59: ......