PAGE INTRO 2
MAR 30/2020
INSTALLATION MANUAL OPERATION MANUAL
KANNAD 406 AF / AF-H / AF (6D)
© 2020 Orolia S.A.S. All rigths are strictly reserved.
PAGE INTENTIONALLY LEFT BLANK
Page 1: ...itter Orolia S A S INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D P N S1821502 02 KANNAD 406 AF transmitter P N S1822502 02 KANNAD 406 AF H transmitter P N S1821502 06 KANNAD 406 AF 6D transmitter P N S1820511 01 Mounting bracket 1 strap 2020 OROLIA S A S ALL RIGHTS ARE STRICTLY RESERVED ...
Page 2: ... proprietary and confidential information and data and is the sole property of Orolia S A S and or its affiliates The documents any attached materials and or information contained therein must not be used disseminated or distributed except for the agreed purpose unauthorized use reproduction or issue to any third party is not permitted without the prior written consent of Orolia S A S This documen...
Page 3: ... INSERTION DATE BY 01 02 03 04 05 06 OCT 14 2003 OCT 14 2003 J S 07 NOV 19 2003 NOV 19 2003 J S 08 APR 23 2004 APR 23 2004 J S 09 JAN 24 2005 JAN 24 2005 J S 10 JUN 27 2005 JUN 27 2005 J S 11 FEB 01 2008 FEB 01 2008 J S 12 JUN 23 2008 JUN 23 2008 J S 13 APR 26 2010 APR 26 2010 J S 14 JUL 22 2013 JUL 22 2013 J S 15 NOV 15 2017 NOV 15 2017 C L G 16 MAR 30 2020 MAR 30 2020 C L G ...
Page 4: ...INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D RECORD OF REVISIONS ROR PAGE 2 MAR 30 2020 2020 Orolia S A S All rigths are strictly reserved PAGE INTENTIONALLY LEFT BLANK ...
Page 5: ...Record of Revisions ROR 1 MAR 30 2020 ROR 2 MAR 30 2020 List of Effective Pages LEP 1 MAR 30 2020 LEP 2 MAR 30 2020 LEP 3 MAR 30 2020 LEP 3 MAR 30 2020 Table of Contents TOC 1 MAR 30 2020 TOC 2 MAR 30 2020 TOC 3 MAR 30 2020 TOC 4 MAR 30 2020 Introduction INTRO 1 MAR 30 2020 INTRO 2 MAR 30 2020 System Overview 1 MAR 30 2020 2 MAR 30 2020 3 MAR 30 2020 4 MAR 30 2020 5 MAR 30 2020 7 MAR 30 2020 8 MAR...
Page 6: ...scription and Operation 101 MAR 30 2020 102 MAR 30 2020 103 MAR 30 2020 104 MAR 30 2020 105 MAR 30 2020 106 MAR 30 2020 107 MAR 30 2020 108 MAR 30 2020 Installation Removal 201 MAR 30 2020 202 MAR 30 2020 203 MAR 30 2020 204 MAR 30 2020 205 MAR 30 2020 206 MAR 30 2020 207 MAR 30 2020 208 MAR 30 2020 209 MAR 30 2020 210 MAR 30 2020 211 MAR 30 2020 212 MAR 30 2020 SUBJECT PAGE DATE ...
Page 7: ...ll rigths are strictly reserved Check 301 MAR 30 2020 302 MAR 30 2020 303 MAR 30 2020 304 MAR 30 2020 Troubleshooting 401 MAR 30 2020 402 MAR 30 2020 Schematics and Diagrams 501 MAR 30 2020 502 MAR 30 2020 503 MAR 30 2020 504 MAR 30 2020 503 MAR 30 2020 504 MAR 30 2020 Servicing 601 MAR 30 2020 602 MAR 30 2020 SUBJECT PAGE DATE ...
Page 8: ...LIST OF EFFECTIVE PAGES LEP PAGE 4 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...ntenna 4 Design features 5 General 5 Mechanical design 5 Compatibility list 6 Remote control panels RCP 6 DIN 12 connector or programming dongles 6 ELT NAV System Interface 6 External antennas 7 KANNAD 406 AF 7 KANNAD 406 AF H and KANNAD 406 AF 6D 7 SYSTEM FUNCTIONAL DESCRIPTION AND OPERATION 101 Transmitter 101 Controls 102 Working mode information 103 Off 103 Self Test 103 Armed 103 On 104 Endur...
Page 10: ...6 AF H installation 206 KANNAD 406 AF 6D installation 207 ELT installation 208 Antenna Installation 209 Antenna Installation Recommendations 209 FAA Recommendations 209 RTCA DO 204 Requirements for ELT location 209 Antenna installation procedure 210 First power up 211 ELT Removal 212 CHECK 301 Self test 301 Periodicity 301 Self test procedure 301 ELT operational tests 302 Installation without prog...
Page 11: ...ed SCHEMATICS DIAGRAMS 501 Outline Dimensions 501 Drilling Mask 502 Wiring 503 ANT AV200 outline dimensions and drilling mask 504 ANT AV300 outline dimensions and drilling mask 505 ANT560 outline dimensions and drilling mask 506 SERVICING 601 Maintenance Schedule 601 Periodic inspection 601 Battery replacement 601 Battery replacement requirements 602 ...
Page 12: ...TABLE OF CONTENTS TOC PAGE 4 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...ON The instructions in this manual provide the information necessary for the installation and the operation of KANNAD 406 AF AF H and AF 6D ELTs Servicing instructions are normally performed by shop personnel For servicing and maintenance instructions refer to relevant CMM For regulatory requirements please consult your national aviation authority ...
Page 14: ...PAGE INTRO 2 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved PAGE INTENTIONALLY LEFT BLANK ...
Page 15: ...d terrestrial vehicles anywhere in the world It uses distress beacons fitted on mobiles and a constellation of LEO and GEO satellites which process the 406 MHz signal to ground stations LUT where the beacon positions are determined with a precision of less than 2 NM Several types of beacons are designed to match the various applications of the COSPAS SARSAT system EPIRB Emergency Position Indicati...
Page 16: ...round stations 44 LEOLUTs and 20 GEOLUTS The aircraft is located by Doppler effect by the LEO satellites with a precision better than 2 NM 4 km at any point of the earth C Environmental improvements of ELTs The certification of an ELT includes a range of severe mechanical tests resistance to flame impact and crush tests resistance to 100 G and 500 G shocks watertightness antideflagration extreme t...
Page 17: ...ED 62 4 an outside antenna 5 a Programming Dongle for pin programming function option 6 CS144 Interface Module option The transmitter bracket Programming Dongle and CS144 Interface Module are installed in the aircraft near the tail The outside antenna is mounted on the fuselage near the tail The remote control panel is installed in the cockpit and connected to the ELT with a 4 or 5 wire bundle Fig...
Page 18: ...he ELT with a Velcro strap This enables quick removal of the ELT for maintenance or exchange C Remote Control Panel A remote control panel is available for installation in the cockpit in order to enable the pilot to monitor and control the ELT status The following controls are to be found on the panel 3 position switch ON ARMED RESET TEST red or amber visual indicator beeper on certain versions Th...
Page 19: ...General The KANNAD 406 AF AF H AF 6D belong to the AF type of ELTs which are permanently attached to an aircraft B Mechanical design The KANNAD 406 AF AF H AF 6D are made of moulded plastic with excellent mechanical resistance ASA PC light yellow colour The housing is designed with no sharp edges Figure 3 KANNAD 406 AF AF H AF 6D with mounting bracket ...
Page 20: ...3 07 RC200 S1820513 11 RC200 NVG S1820513 14 RC300 S1820513 09 RC400 S1820513 05 RC500 320 S1820513 02 RC600 NVG Y S1820513 12 RC600 NVG W S1820513 13 RC800 S1820513 15 RC810 S1820513 23 Orolia Designation Orolia Part Number DIN 12 connector S1820514 03 Programming dongle S1820514 01 Programming dongle A320 S1820514 04 Programming dongle A330 340 S1820514 05 Programming dongle Assy S1820514 06 Oro...
Page 21: ...T560 DAYTON GRANGER ELT10 696 1 0145787 BLADE ANTENNA ANT650 CHELTON 2624 82 0124251 BLADE ANTENNA ANT700 CHELTON 2632 82 1002063 N A HR SMITH 10 118 32 N A Orolia Designation Manufacturer Orolia Part Number WHIP ANTENNA AV200 RAMI AV 200 0146150 ROD ANTENNA AV300 RAMI AV 300 0146151 ROD ANTENNA ANT300 CHELTON 1327 82 0124220 N A DAYTON GRANGER ELT 720063 N A BLADE ANTENNA ANT560 DAYTON GRANGER EL...
Page 22: ...PAGE 8 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved PAGE INTENTIONALLY LEFT BLANK ...
Page 23: ...inting and identification of the aircraft in distress Once activated the transmitter operates continuously on 121 5 and 243 0 MHz with an output power of 100 mW on each frequency The modulation is an audio frequency sweeping downwards from 1420 Hz to 490 Hz with a repetition rate of 3 Hz During the first 24 hours of operation a digital message is transmitted on 406 025 MHz every 50 seconds The out...
Page 24: ...the antenna Figure 101 Front Panel The visual indicator gives an indication on the working mode of the beacon after the self test a series of short flashes indicates an unsactifactory self test one long flash indicates a correct self test in operating mode periodic flashes during 121 5 243 MHz transmission long flash during 406 MHz transmission A buzzer gives audio information on the beacon workin...
Page 25: ...ter Battery voltage Programming and enables digital communication with a programming and test equipment This mode is selected when switching from OFF to ARM when switching to RESET TEST on the Remote Control Panel provided that the switch of the ELT is in the ARM position when switching to ON prior to transmission After a few seconds the test result is displayed with the visual indicator as follow...
Page 26: ... occurs provided that the ELT switch is in position ARM When this mode is selected the ELT starts transmission on 121 5 MHz 243 MHz immediately continuous transmission on 406 MHz after approximately 50 seconds 406 MHz burst every 50 sec during 24 hours The red visual indicator on the ELT and on the remote control panel if installed flashes and the buzzer operates In case of accidental activation t...
Page 27: ...eferable to keep the battery power for 121 5 243 MHz homing frequency transmission for the rescue operations the 406 MHz transmission is deliberately stopped after 24 hours to extend the 121 5 243 MHz transmission for as long as possible The transmitter battery expiry date is fixed at 7 years from date of cell manufacturing CDOM If no activation of the ELT occurs during the battery lifetime it sha...
Page 28: ...o the Programming or Maintenance Dongles to the CS144 interface and or to the programming equipment PR600 IMPORTANT Shielded cables are recommended The required wires are AWG24 Table 1 J1 connector pin out This wire is not used with some versions of Remote Control Panels For precise information refer to Remote Control Panel technical description J2 Connector J2 is used to connect the outside anten...
Page 29: ...f modulation signal 1420 Hz to 490 Hz with decreasing sweep Endurance Over 48 hours at 20 C CONTROLS ARM OFF ON switch Red visual indicator BNC antenna connector DIN12 connector for remote control panel and pin programming option Buzzer G SWITCH SENSOR Mechanical G switch sensor compliant with EUROCAE ED62 specifications 6 G switch assembly in ELT KANNAD 406 AF 6D S1821502 06 BATTERY KIT BAT300 P ...
Page 30: ... on the Remote Control Panel The ELT starts with the self test sequence 121 5 243 MHz transmission starts immediately after the self test 406 MHz starts after approximately 50 seconds 406 MHz burst every 50 sec during 24 hours During transmission buzzer operates and visual indicator flashes 8 Reset It is possible to stop the ELT in case of unintentional activation Important notice As 406 MHz trans...
Page 31: ...pment or programming dongle This operation takes less than 2 minutes and does not need any hardware operation The identification is simply downloaded in the ELT when connected to the programming equipment via the DIN 12 connector A Pin programming option The KANNAD 406 AF AF H AF 6D offer pin programming capabilities to facilitate maintenance operations especially in case of removals and or replac...
Page 32: ...s possible to delete the identification information of the ELT by connecting a Maintenance Dongle to the ELT Any accidental transmission with this maintenance dongle will not involve SAR operation as the identification code transmitted is recognised by COSPAS SARSAT as not on board When a maintenance dongle is connected Country code is 227 France Protocol is Test Identification number is SI 5 digi...
Page 33: ...cific type or class of aircraft must determine that the aircraft installation conditions are within the TSO standards TSO articles must have separate approval for installation in an aircaft The article may be installed only according to 14 CFR part 43 of the applicable airworthiness requirements 3 RTCA DO 182 Recommandations All ELT system components which must survive to a crash intact should be ...
Page 34: ... 206 KANNAD 406 AF 6D Refer to 3 KANNAD 406 AF 6D installation page 207 Drill 4 holes Ø 6 mm in the aircraft structure according to Drilling mask Holes 4 5 6 7 shall be preferred If the aircraft structure is not solid enough to withstand a 500 kg traction on the bracket a reinforcement plate not supplied should be installed as shown Figure 202 Bracket installation Fix the bracket with the 4 screws...
Page 35: ...sequently the KANNAD 406 AF shall be mounted with the arrow of the Direction of Flight label pointed towards the front of the aircraft b Helicopters The KANNAD 406 AF can be installed in its standard version on helicopter The ELT unit should be mounted with the front face connectors pointing downwards at a 45 angle to the yaw axis with maximum tolerance of 15 and with Direction of Flight arrow tow...
Page 36: ...point towards the front or the bottom of the helicopter and not pointing 45 downwards with maximum tolerance of 15 If the KANNAD 406 AF H is installed with the Direction of Flight arrow pointing towards the front of the helicopter the ELT shall be mounted with the upper side pointing towards the top of the helicopter If the KANNAD 406 AF H is installed with the Direction of Flight arrow pointing t...
Page 37: ...0 Orolia S A S All rigths are strictly reserved 3 KANNAD 406 AF 6D installation Figure 205 KANNAD 406 AF 6D installation For fixed wings aircraft and helicopters the KANNAD 406 AF 6D shall be mounted in roll or pitch plane either parallel or perpendicular to the aircraft flight direction ...
Page 38: ...d in its bracket by trying to extract it manually thereby verifying there is no play and that it remains attached when extraction from the bracket is attempted Connect the external antenna to the BNC connector Refer to Figure 207 Installation controls and connectors as shown Figure 2 ELT system description page 3 NOTE regarding the external antenna The specific installation tightening torque etc o...
Page 39: ...A regulations Duplicating a previous installation may not be acceptable Methods for installing antenna are outlined in AC43 13 12 refer to FAA Advisory Circular 43 13 2A Acceptable Methods Techniques and Practices Aircraft Alterations specifically Chapters 1 3 11 and 13 2 RTCA DO 204 Requirements for ELT location ELT antennas should be located away from other antennas to avoid disruption of antenn...
Page 40: ...lity of the installation agency to determine the appropriate and adequate antenna installation Locate a position on the fuselage according to 2 RTCA DO 204 Requirements for ELT location page 209 A double plate may be necessary for the antenna to meet rigidity specifications in Section Section 2 RTCA DO 204 Requirements for ELT location page 209 A 9 Kilogram force 20 pound force applied in all dire...
Page 41: ...n the coaxial cable is 1 dB 406 MHz and the minimum permitted attenuation is 0 5 dB especially for the HR Smith 10 118 32 2 Fit both ends of coaxial cable with a waterproof Male BNC connector not supplied reference RADIALL R141007 or equivalent Connect one Male BNC connector to the antenna Female BNC socket 4 First power up Perform the following tests 1 ELT operational tests Refer to A ELT operati...
Page 42: ...sconnect the Remote Control Panel or CS144 from the DIN12 connector Refer to Figure 207 Installation controls and connectors Disconnect the outside antenna from the BNC connector Refer to Figure 207 Installation controls and connectors Unfasten the self stripping strap Remove the transmitter from the bracket Figure 209 Removing the transmitter CAUTION WHEN ACTIONING THE ARM OFF ON SWITCH PULL LEVE...
Page 43: ...to position ARM or press RESET TEST on the Remote Control Panel ensure that the ELT switch is in the ARM position The buzzer operates during the whole Self test procedure After a few seconds the test result is displayed with the visual indicator as follows One long flash indicates that the system is operational and that no error conditions were found A series of short flashes see Remark below indi...
Page 44: ... Installation with programming dongle connect the outside antenna to J2 switch the ELT from OFF to ARM check that the Self Test fails 3 4 flashes if not connect a maintenance dongle to J1 Switch the ELT from OFF to ARM Check that the Self Test fails 3 4 flashes Remove the maintenance dongle from J1 connect the programming dongle to J1 switch the ELT from OFF to ARM the buzzer operates during the w...
Page 45: ... correct operation of RCP LED and external buzzer by switching ELT and RCP as described in the sequential procedure hereunder with ELT switch in the ARM position Figure 301 RCP LED and buzzer operation IMPORTANT 2 before switching the RCP to ON wait for the end of the self test CAUTION WHEN ACTIONING THE ARM OFF ON SWITCH PULL LEVER TO UNLOCK AND SET TO POSITION ...
Page 46: ...est sequence always begins with FF FE D0 whereas a programmed message begins with FF FE 2F Example of message programmed in ELT FF FE 2F 53 C3 24 97 38 0B A6 0F D0 F5 20 Example of same message decoded by a COSPAS SARSAT decoder FF FE D0 53 C3 24 97 38 0B A6 0F D0 F5 20 3 121 5 MHz IMPORTANT Authority only allows this test to be conducted within the first five minutes after any hour and limits the...
Page 47: ...s and repair 2 3 2 flashes Low RF power Check 406 MHz power refer to relevant CMM for tests and repair 3 3 3 flashes Faulty VCO locking faulty frequency Check 406 MHz frequency refer to relevant CMM for tests and repair 4 3 4 flashes No identification programmed Check if the dongle if applicable or the ELT is properly programmed NOTE For servicing instructions refer to Service Letter SL S18XX50X 2...
Page 48: ...PAGE 402 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved PAGE INTENTIONALLY LEFT BLANK ...
Page 49: ...PAGE 501 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved SCHEMATICS DIAGRAMS 1 Outline Dimensions ...
Page 50: ...PAGE 502 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved 2 Drilling Mask ...
Page 51: ...PAGE 503 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved 3 Wiring ...
Page 52: ...PAGE 504 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved 4 ANT AV200 outline dimensions and drilling mask ...
Page 53: ...PAGE 505 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved 5 ANT AV300 outline dimensions and drilling mask ...
Page 54: ...PAGE 506 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved 6 ANT560 outline dimensions and drilling mask ...
Page 55: ...PAGE 507 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved PAGE INTENTIONALLY LEFT BLANK ...
Page 56: ...PAGE 508 MAR 30 2020 INSTALLATION MANUAL OPERATION MANUAL KANNAD 406 AF AF H AF 6D 2020 Orolia S A S All rigths are strictly reserved PAGE INTENTIONALLY LEFT BLANK ...
Page 57: ...NOTE These checks can be carried out without opening the ELT These tests are described in Service Letter SL S18XX502 25 12 B Battery replacement Testing of the various elements of the ELT is mandatory when the battery is replaced NOTE For battery replacement intervals Refer to 2 Battery replacement requirements page 602 Visual control of the housing and accessories O ring battery and desiccant cap...
Page 58: ...ANNAD Battery Replacement Center is available on our Website https www orolia com Orolia S A S Z I des Cinq Chemins CS10028 56520 GUIDEL FRANCE Telephone 33 0 2 97 02 49 49 Fax 33 0 2 97 65 00 20 Web https www orolia com Support support orolia com Tel 33 0 2 97 02 49 00 Only original and approved battery pack included in battery KIT BAT300 P N S1820516 99 manufactured by Orolia S A S can be instal...
Page 59: ......
Page 60: ...DMA174S Distributed by Manufactured by Orolia S A S Z I des Cinq Chemins CS10028 56520 GUIDEL FRANCE Tél Phone 33 0 2 97 02 49 49 Fax 33 0 2 97 65 00 20 ...