General Instructions
Operations sequence
34
cpg.1
GIS-type medium-voltage switchgear with full insulation in gas, up to 38 kV,
in accordance with IEEE Standards
IG-197-US version 02; 07/11/2019
7.4 cpg.1-f1 cubicle
Figure 7.20
Initial situation for
cpg.1-f1
cubicle
7.4.1 Commissioning the cubicle
Initial conditions: busbar disconnector open and
grounding switch open.
1. Connect the busbar disconnector by turning the lever
clockwise.
Figure 7.21
Condition after turning the lever
2. Check the change of status of the busbar disconnector
position indicator.
Figure 7.22
Busbar disconnector closed detail
To put the equipment out of commission, reverse
the sequence of operation.