
Operations sequence
General instructions
29
cpg.1
GIS-type medium-voltage switchgear with full insulation in gas, up to 38 kV,
in accordance with IEEE Standards
IG-197-US version 02; 07/11/2019
7.2 cpg.1-s1 cubicle
Figure 7.6
Initial situation for
cpg.1-s1
cubicle
7.2.1 Connection
Initial conditions: busbar disconnector open and
grounding disconnector open.
1. Connect the busbar disconnector by turning the lever
clockwise.
Figure 7.7
Condition after turning the lever
To put the equipment out of commission, reverse
the sequence of operation.
Summary of Contents for velatia cpg.1
Page 43: ......