
General Instructions
Operations sequence
32
cpg.1
GIS-type medium-voltage switchgear with full insulation in gas, up to 38 kV,
in accordance with IEEE Standards
IG-197-US version 02; 07/11/2019
7.3.2 Busbar grounding on the right
Initial conditions: busbar disconnectors open,
grounding disconnectors open and circuit breaker
open.
1. First connect the right busbar disconnector by turning
the lever clockwise.
Figure 7.14
Condition after turning the lever
2. Next, close the left-hand grounding disconnector.
Figure 7.15
Condition after turning the lever
3. The circuit breaker closes instantaneously on removal of
the driving lever once the operation is complete.
Figure 7.16
Condition after removing the lever
To open the grounding connection, proceed in
reverse order. Act on the bottom pushbutton to
open the circuit breaker.
The circuit breaker opening operation is always
performed manually.
Summary of Contents for velatia cpg.1
Page 43: ......