4.5. Fastening to the floor
Before assembly, the floor must be carefully levelled to
prevent any deformation which may make it difficult to
connect the cubicles to one another.
The cubicles can be fastened to the floor in two ways:
4.5.1. Fastening to the floor on profile
If the floor of the facility is not sufficiently uniform, it is
advisable to install the medium voltage cubicles on an
auxiliary profile, to make it easier to connect. This profile,
which can be supplied to order, must be anchored to the
floor using expansion screws.
A
M10 x 25 bolt
B
65 x 65 x 4 mm profile
C
Anchoring bracket
Figure 4.11.
Fastening cubicles on profile