IG-297-EN version 01; 06/02/2020
20
Installation
General instructions
cgmcosmos
system: Medium voltage switchgear
and control gear, fully insulated in SF
6
gas up
to 24 kV with external cable test device
4.5.2. Anchoring to the floor
[8]
See section “5. Recommended sequence of operations”.
If the floor of the installation is even enough, it is advisable
to install the medium voltage cubicle assembly directly
anchored to the floor.
The sequence for anchoring the cubicles to the floor is as
follows:
1.
All the cubicle’s functions must be in the earthing
position
[8]
.
2.
In the
feeder functions
:
a.
Remove the cable test compartment cover, using
the central handle on the cover to pull it up and
forward:
Figure 4.7.
Removing the cable test compartment access cover
b.
Remove the cable compartment cover, using the
central handle on the cover to pull it up and forward:
Figure 4.8.
Removing the cable compartment cover
Summary of Contents for cgmcosmos-2lP
Page 51: ......