16
Particles in exhaust gases fl owing through the heat exchanger create on their surface deposit.
Deposition causes lowering of inner pipes dimension and lowering of heat exchange surface. That
is why it is necessary to clean heat exchanger pipes each time after boiler stoking.
Follow the steps of how to clean heat exchanger’s pipes:
1. Remove back upper heat exchangers panel.
2. Unscrew bolts holding heat exchangers' lid.
3. Clean each of pipes with round tools moving it up and down.
Ash created during wood burning falls down through the nozzle to ash chamber, that’s why it is
advisable to remove the ash from bottom chamber.
Each time before lightning up the boiler it is recommended to clean loading chamber. Ash needs to
be removed through the nozzle. Use the tools supplied with the boiler.
Pitch is created during gasifi cation process. Amount of created pitch depends on wood type,
humidity and water temperature coming out and into the boiler. It is recommended to clean loading
chamber at least once a month.
Summary of Contents for Orligno 600
Page 1: ...ORLIGNO 600 INSTRUCTION MANUAL SERVICE MANUAL HOT AIR BLOWER...
Page 17: ...17 1 2 3...
Page 26: ...26 2 5 Dimensions...
Page 31: ...31...
Page 32: ......