background image

Temperature range

- 58 °C to + 390 °C

Boiler temperature settings

+ 50 °C to + 120 °C

Heater temperature settings

+ 40 °C to + 120 °C

Smooth blow-through control

yes

Controllable min. fan power

30 - 70 %

Controllable max. fan power

30 - 100 %

Fan hysteresis

0 °C to 9 °C

Heater hysteresis

10 °C

Blow-through control

work time: 0 - 90 sec.

pause: 1 - 60 min.

Controllable boiler extinguishing time

0 - 45 min.

Input power

fan: 100 VA / 230 V

heater: 100 VA / 230 V

Voltage AC

230 V, 50 Hz

Electrical protection

2 x 1,25 A

Relative air humidity

< 95 %

Protection class

IP 40

Insulation class

II

Ambient temperature

0 °C to + 40 °C

Software class

A

Operation type

fan: 1Y

heater: 1B

4.10. Technical data of the controller

12

Summary of Contents for Orligno 600

Page 1: ...ORLIGNO 600 INSTRUCTION MANUAL SERVICE MANUAL HOT AIR BLOWER...

Page 2: ...parameters setting and lightning up 4 4 4 Service mode OPERATION PARAMETERS 6 4 5 Service mode LANGUAGE 9 4 6 Service mode TEST 10 4 7 Service mode SERVICE SETTINGS 10 4 8 Room temperature controller...

Page 3: ...it for every purposes Controller protects boiler against overheating with blow fan turning off and back fan activation 2 Principle of work Gasification boilers utilize process of dry pyrolitic wood di...

Page 4: ...ORLIGNO 600 hot air blower is delivered fully assembled attached with screws to pallet and wrapped in foil ORLIGNO 600 comes with set of cleaning tools 3 pcs and documentation manual warranty card an...

Page 5: ...N The fuses should be replaced with the controller switched off and unplugged 4 2 Controller switch on Turn on the controller using on off switch The display should show the name of the controller and...

Page 6: ...the HI parameter 6 4 4 Service mode OPERATION PARAMETERS Fan hysteresis This parameter shows how much the temperature must fall from set temperature to turn the fan on Temperature setting range 0 C t...

Page 7: ...modulation is limited to hysteresis i e it works within the range of set boiler temperature and set hysteresis parameter Below hysteresis the fan works with maximum set power Maximal fan power control...

Page 8: ...0 C to 120 C Extinguish time control This parameter allows for setting the fan operation extinguish when the temperature on the sensor falls down to 30 C Setting range 0 45 minutes Blow through operat...

Page 9: ...set by the HI parameter ATTENTION Setting the operation time for 0 will turn off the blow through function Fan pause stoking Parameter setting the fan pause time necessary for stoking the boiler Time...

Page 10: ...on representing individual device fan heater By pressing or buttons individual devices are turned on off 4 7 Service mode SERVICE SETTINGS This function cancels all settings entered by the user and re...

Page 11: ...ocket 4 9 Temperature sensor damage If the temperature sensor is damaged the controller will STOP and will appear on the display instead of the temperature The red diode FAILURE will be on It is possi...

Page 12: ...C to 9 C Heater hysteresis 10 C Blow through control work time 0 90 sec pause 1 60 min Controllable boiler extinguishing time 0 45 min Input power fan 100 VA 230 V heater 100 VA 230 V Voltage AC 230...

Page 13: ...lity moisturecontentandtypeofburned wood The best is hardwood beech oak harnbeam with moisture content 15 20 Lenght of wood should be the same as depth of loading chamber Usage other types of wood lik...

Page 14: ...le stoking the hot air blower Wood dimensions larger than recommended may cause troubles during closing the upper door It is necessary to avoid closing upper door with force it may damage the door ATT...

Page 15: ...ter burning softwood leave the boiler open in this way damp is not condensing on the sides of boiler ATTENTION It is advisable to control the hot air blower annually in order to prepare it well for th...

Page 16: ...exchangers lid 3 Clean each of pipes with round tools moving it up and down Ash created during wood burning falls down through the nozzle to ash chamber that s why it is advisable to remove the ash f...

Page 17: ...17 1 2 3...

Page 18: ...ptable to clean the fan blades with brush with soft bristle or vacuum cleaner Cleaning of both fans should be done at least once a year after or before heating season blocking nut 6 2 Hot air blower t...

Page 19: ...tilation 20 1 4 Hot air blower connection to chimney system 20 2 Technical data 22 2 1 EKOSTER 3 technical data 22 2 2 EKOSTER 3 installation recommendations 22 2 3 Technical data of heater 23 2 4 Ele...

Page 20: ...s in which the hot air blower is sold 1 Boiler room height should be at least 2 2 m for easier boiler cleaning 2 Distance from boiler room walls should allow for free access to boiler sides and should...

Page 21: ...f non inflammable material 1 3 Exhaust ventilation 1 Exhaust duct should be made of bricks with section of at least 25 of chimney section not less 14 x 14 cm Inlet hole cannot have any devices that re...

Page 22: ...ll draft regulator which stabilizes chimney draft and in case too big underpressure in chimney opens up and sucks in air from boiler room instead of hot air blower Pic 2 Stainless steel double wall ch...

Page 23: ...ed to check controller s settings before lightning up 8 Controller is equipped with two 1 25 A fuses Temperature range from 58 C to 390 C Boiler temperature settings from 50 C to 120 C Heater temperat...

Page 24: ...or fuses replacement 8 7 T1 L N N N L L room thermostat hot air sensor ground front fan live heater live 230 power supply live front fan neutral heater neutral 230 power supply neutral T1 L N N N L L...

Page 25: ...thermostat hot air sensor ground front fan live heater live 230 power supply live front fan neutral heater neutral 230 power supply neutral contactor s coil working contacts of contactor heater front...

Page 26: ...26 2 5 Dimensions...

Page 27: ...lower 1 Hot air outlet 2 Hot air controller 3 Loading door 4 Front fan 5 Combustion door 6 Firebricks 7 Combustion chamber 8 Nozzle 9 Heater 10 Tube heat exchanger 11 Ceramic moulders 12 Loading gasif...

Page 28: ...d logs lenght cm 50 Humidity recommended 15 25 Fuel usage for power nominal kg h 8 2 Temperatures setting range C 50 120 Protection level of controller IP 40 Voltage Frequency V Hz 230 50 Exhaust gase...

Page 29: ...aged heat exchanger s lid Replace lid call service Smoking from loading door Strong wind force exhaust gases into the chimney Consider installation of appliances supporting chimney draft WKO Unproper...

Page 30: ...to reuse electrical and electronic components Symptom Reason Action Weak work of fan Polluted fan blades Control cleaning Fan flap clogged with pitch Clean or call service Explosions in hot air blower...

Page 31: ...31...

Page 32: ......

Reviews: