15
gas valve, weld open , ,replace the drier and hot gas valve, weld ,recover
¾
l, locate the evaporator, open the process/suction , weld open the
¾
¾
Locate the drier and hot
refrigerant , evacuate and weigh in the nameplate charge.
Reverse the above step to reassemble.
¾
If need replace the evaporator.
¾
Remove the front and top pane
two welds, replace a new one. Recover refrigerant, evacuate and weigh in the nameplate charge.
Reverse the above step to reassemble.