28
Setting the boiler heating period
9.2 Setting the boiler heating period
Note:
This function is only available if an external heating controller is used and no DHW sensor is connected to
the boiler controller.
Please also refer to the installation manual, chapter 13, "
Controller for heating and hot water
"
If heating periods are programmed, the boiler runs at the set times.
During these periods, burner requests from the external controller (terminal 7/8) are ignored.
Outside the programmed heating periods, burner demand from the external controller (terminal 7/8) is active
again.
Note:
Programming of heating periods is NOT advisable if an external controller is used!
– button
Cursor at the hour.
– button
200013_EN 1.2
Summary of Contents for Easypel
Page 1: ...Operating Manual Easypell 16 32kW ENGLISH...
Page 14: ...14 Emptying the ash pan 200013_EN 1 2...
Page 16: ...16 Cleaning the boiler every year Procedure for cleaning the boiler 200013_EN 1 2...
Page 18: ...18 Cleaning the boiler every year Cleaning the Induced draft blower 200013_EN 1 2...
Page 38: ......
Page 39: ......
Page 40: ......