DP-100SL
45
Site Preparation Guide
Imaging Room Issues (cont.d)
Complete
Pending
Date
Notes
The ceiling is painted with epoxy, or other
low-porosity, non-shedding, washable paint, or
covered with non-shedding ceiling tiles.
Room is in Clean Room 100,000 class or better
(according to US Federal Std. 209E).
Clean room conditions is prepared prior to system
installation.
All surfaces have a non-reflective matte finish.
The system is not located near heavy machinery.
The amplitude of movement of vibrations must be
less than 1.5 µm at 2 ~ 9 Hz.
The amplitude of acceleration of vibrations is less
than 5 m/s
²
at 9 ~ 200 Hz.
Floor strength is at least 1800 kg/m
².
Floor incline no more than 5 mm per meter
(1” per 16 ft.).
The floor is covered with anti-static tile, rubber or
linoleum. No carpeting.
The Imaging room is its own room with its own
environment (i.e. not part of a bigger room).
Pump Room Issues
Complete
Pending
Date
Notes
Pump room size at least:
0.5 x 1 (meters)
1.64 x 3.28 (feet)
Pump room is its own room with its own
environment (must be ventilated!).
Pump installed and connected.
Summary of Contents for DP-100SL
Page 1: ...DP 100SL Site Preparation Guide October 2003 Revision A ...
Page 2: ......
Page 14: ......
Page 18: ......
Page 25: ...DP 100SL 19 Site Preparation Guide Figure 3 2 System Dimensions Front View ...
Page 26: ...20 Chapter 3 Facility Physical Requirements Figure 3 3 System Dimensions Side View ...
Page 27: ...DP 100SL 21 Site Preparation Guide Figure 3 4 Site Dimensions Standard Configuration ...
Page 32: ......
Page 40: ......
Page 48: ......