38
Chapter 9
Shipment and Delivery
Equipment
The customer should provide necessary equipment such as forklifts or
cranes for unloading of equipment.
• Forklift—capable of lifting 2500 kg / 5512 lbs; with a 190 cm (75 inch)
extension
• Pallet jack
• J-Bar
Personnel
The customer must furnish professional riggers to unload the crates and
transfer them to the site. The riggers will assist Orbotech personnel in
unpacking the equipment.
No equipment should be unpacked before the arrival of Orbotech
personnel.
Clearances
Check crate delivery routes and remove all obstructions. Ensure that all
doors and hallways along the delivery route are large enough to provide
sufficient clearance, that elevators (if needed) have the required capacity,
and that corridors are free of slopes or sharp bends.
Summary of Contents for DP-100SL
Page 1: ...DP 100SL Site Preparation Guide October 2003 Revision A ...
Page 2: ......
Page 14: ......
Page 18: ......
Page 25: ...DP 100SL 19 Site Preparation Guide Figure 3 2 System Dimensions Front View ...
Page 26: ...20 Chapter 3 Facility Physical Requirements Figure 3 3 System Dimensions Side View ...
Page 27: ...DP 100SL 21 Site Preparation Guide Figure 3 4 Site Dimensions Standard Configuration ...
Page 32: ......
Page 40: ......
Page 48: ......