background image

SPARC T8-4 Server Installation Guide

Part No: E80509-01

September 2017

Summary of Contents for SPARC T8-4

Page 1: ...SPARC T8 4 Server Installation Guide Part No E80509 01 September 2017 ...

Page 2: ......

Page 3: ...mation management applications It is not developed or intended for use in any inherently dangerous applications including applications that may create a risk of personal injury If you use this software or hardware in dangerous applications then you shall be responsible to take all appropriate fail safe backup redundancy and other measures to ensure its safe use Oracle Corporation and its affiliate...

Page 4: ...des informations Ce logiciel ou matériel n est pas conçu ni n est destiné à être utilisé dans des applications à risque notamment dans des applications pouvant causer un risque de dommages corporels Si vous utilisez ce logiciel ou ce matériel dans le cadre d applications dangereuses il est de votre responsabilité de prendre toutes les mesures de secours de sauvegarde de redondance et autres mesure...

Page 5: ... 15 Confirming Specifications 17 Physical Specifications 17 Electrical Specifications 18 Environmental Requirements 19 Airflow Precautions 20 Preparing for Installation 23 Shipping Kit 23 Handling Precautions 25 ESD Precautions 25 Tools Needed for Installation 26 Prepare the Server 27 Installing the Server 29 Rack Compatibility 30 Rack Cautions 30 Stabilize the Rack 32 Installing the Rackmount Kit...

Page 6: ...pping Brace 50 Connecting Cables 51 Cabling Requirements 51 Identifying Ports 53 USB Ports 53 SER MGT Ports 54 NET MGT Port 55 Ethernet Ports 56 VGA Port 57 Connecting Data and Management Cables 58 Connect the SER MGT Cable 59 Connect the NET MGT Cable 59 Connect the Ethernet Network Cables 60 Connect Other Data Cables 61 Secure Cables Using the CMA 61 Powering On the Server for the First Time 65 ...

Page 7: ...State to Install a Fresh OS Oracle ILOM Web Interface 74 Oracle Solaris OS Configuration Parameters 76 Assigning a Static IP Address to the SP 77 Log In to the SP SER MGT Port 77 Assign a Static IP Address to the NET MGT Port 79 Auto Service Request Software 80 Related Information 81 Glossary 83 Index 89 7 ...

Page 8: ...8 SPARC T8 4 Server Installation Guide September 2017 ...

Page 9: ...s and authorized service providers Required knowledge Advanced experience installing and configuring data center equipment Product Documentation Library Documentation and resources for this product and related products are available at http www oracle com goto t8 4 docs Feedback Provide feedback about this documentation at http www oracle com goto docfeedback Using This Documentation 9 ...

Page 10: ...10 SPARC T8 4 Server Installation Guide September 2017 ...

Page 11: ...e tasks to install and configure the server Step Description Links 1 Review the Product Notes for any late breaking news about the server SPARC T8 Series Servers Product Notes 2 Review the server features specifications and site requirements Server Overview on page 12 Confirming Specifications on page 17 3 Confirm that you received all of the items you ordered Shipping Kit on page 23 4 Learn the s...

Page 12: ...ure the Oracle ILOM SP power on the server for the first time and set up the operating system Powering On the Server for the First Time on page 65 Related Information SPARC T8 Series Servers Product Notes SPARC T8 4 Server Safety and Compliance Guide SPARC T8 Series Servers Administration Guide SPARC T8 4 Server Service Manual Server Overview This topic provides a high level introduction to the ma...

Page 13: ...al interface Storage devices For internal storage the server provides Eight 2 5 inch hard drives front panel An internal eUSB drive on the rear I O module Ports Four external USB 3 0 ports 2 front 2 rear Video ports Two high density HD 15 video ports 1 front 1 rear Management ports Two RJ 45 SER MGT ports 1 front 1 rear One 100 100 1000 NET MGT port rear Network ports Four 10GbE 100 Mbps 1 Gbps 10...

Page 14: ...t Panel Components on page 14 Rear Panel Components on page 15 SPARC T8 4 Server Service Manual Oracle ILOM documentation Front Panel Components No Description 1 Power button 2 VGA port 3 SER MGT port 4 USB 3 0 ports Related Information Cabling Requirements on page 51 14 SPARC T8 4 Server Installation Guide September 2017 ...

Page 15: ...s to the server Do not connect the power cords until all data cables have been connected No Description Links 1 Power supply unit AC inputs 4 2 NET MGT RJ 45 network port NET MGT Port on page 55 3 SER MGT RJ 45 serial port SER MGT Ports on page 54 4 Network 10GbE 10GbE 100 Mbps 1 Gbps 10 Gbps ports NET 0 NET 3 4 Ethernet Ports on page 56 Understanding the Server 15 ...

Page 16: ...Ports on page 53 6 VGA port VGA Port on page 57 Related Information Front Panel Components on page 14 Cabling Requirements on page 51 Installing the CMA Optional on page 41 Secure Cables Using the CMA on page 61 16 SPARC T8 4 Server Installation Guide September 2017 ...

Page 17: ...ion Server Overview on page 12 Shipping Kit on page 23 Identifying Ports on page 53 Physical Specifications Description Metric U S Rack units 6 RU 6 RU Height 266 7 mm 10 5 in Width 445 mm 17 5 in Depth 835 mm 32 9 in Approximate Weight without rackmount kit 98 66 kg 217 5 lb Minimum service clearance front 914 4 mm 36 in Minimum service clearance rear 914 4 mm 36 in Minimum airflow clearance fron...

Page 18: ...on expected workloads use the SPARC T8 4 power calculator at http www oracle com goto powercalculators Description Value Operating input range 200 to 240 VAC 50 60 Hz Maximum operating input current at 200 VAC per cord 12 6 A Maximum operating input power at 200 VAC 5040 W Actual amperage draw may exceed rating by no more than 10 Note The maximum operating input current values are based on the for...

Page 19: ... to 65 C at 900m 40 to 149 F at 0 to 3000 ft Decrease in maximum temperature above 3000 ft 900m 1 8 F 1000 ft 1 C 300m Relative humidity 10 to 80 at 27 C 10 to 80 at 81 F Up to 85 at 38 C Up to 85 at 100 F Maximum wet bulb noncondensing Altitude 0 to 3000 m at 40 C 0 to 9840 ft at 95 F Up to 12 000 m Up to 40 000 ft In China markets regulations may limit installations to a maximum operating altitu...

Page 20: ...n Proper airflow is essential for keeping the server s internal temperatures within a safe operating range Air flows from the front to the rear of the server Follow these guidelines to ensure unrestricted airflow in the server Adhere to the minimum airflow clearance specifications See Physical Specifications on page 17 Install the server so the front faces the cool aisle and the rear faces the war...

Page 21: ...r ducts and baffles are properly installed Route cables so they do not interfere with airflow Related Information Rack Cautions on page 30 Physical Specifications on page 17 Electrical Specifications on page 18 Environmental Requirements on page 19 Confirming Specifications 21 ...

Page 22: ...22 SPARC T8 4 Server Installation Guide September 2017 ...

Page 23: ...3 Verify that you have the correct tools Tools Needed for Installation on page 26 4 Prepare the server for installation Prepare the Server on page 27 Related Information Installing the Server on page 29 Connecting Cables on page 51 Powering On the Server for the First Time on page 65 Shipping Kit Verify that you have received all of the components that ship with your server Note When you receive t...

Page 24: ...mplate 3 AC power cords 4 4 RJ 45 to DB 9 crossover adapter 5 RJ 45 to DB 25 crossover adapter 6 Print document kit 7 Antistatic wrist strap 8 Ethernet cables 2 9 Rackmounting kit 10 Fasteners 11 CMA 24 SPARC T8 4 Server Installation Guide September 2017 ...

Page 25: ... removed and a lift must be used For a two person installation the main components must be removed and a lift is optional Caution Always communicate your intentions clearly before during and after each step of the rackmounting procedure to minimize confusion Related Information Physical Specifications on page 17 ESD Precautions on page 25 Installing the Server on page 29 SPARC T8 4 Server Getting ...

Page 26: ...25 Tools Needed for Installation on page 26 Rack Cautions on page 30 Tools Needed for Installation Torx T30 screwdriver Long No 2 Phillips screwdriver Cutters or heavy duty scissors Marking pen or tape ESD mat and grounding strap Hydraulic or mechanical lift optional for two person installation In addition you must provide a system console device such as one of the following ASCII terminal Worksta...

Page 27: ... Refer to the SPARC T8 4 Server Service Manual for detailed instructions 3 Determine your next step For a one person installation place the server on a mechanical lift For a two person installation place the server on a mechanical lift if one is available 4 Remove the PCIe card carriers if there are PCIe cards that need to be installed Refer to the service manual for detailed instructions 5 Instal...

Page 28: ...28 SPARC T8 4 Server Installation Guide September 2017 ...

Page 29: ... install the hardware Determine Correct Rackmount Hardware on page 35 Mark the Rackmounting Location on page 36 Install the Shelf Rails on page 37 3 Install the server in the rack Install the Server on page 39 4 Optional Install the CMA Installing the CMA Optional on page 41 5 Optional If you are installing the server into a rack that will be shipped to another location install the shipping brace ...

Page 30: ...The server must be placed on a rack shelf in the non Oracle rack The rack shelf must be capable of supporting a minimum weight of 200 lbs 91 kg The rack shelf must be designed for the rack being used Obtain the rack shelf from the rack vendor Note Installing the server in non Oracle racks using the included rackmounting hardware kit is not supported Related Information Physical Specifications on p...

Page 31: ...equipment nameplate power ratings and consider the effect that circuit overloading might have on overcurrent protection and supply wiring Caution Reliable Grounding Maintain reliable grounding of rackmounted equipment Give particular attention to supply connections other than direct connections to the branch circuit for example use of power strips Caution Do not use slide rail mounted equipment as...

Page 32: ...autions on page 30 2 Open and remove the front and rear doors from the rack 3 To prevent the rack from tipping during the installation stabilize the rack using all antitilt mechanisms provided 4 If there are leveling feet beneath the rack to prevent it from rolling extend these leveling feet fully downward to the floor 5 Install the rackmount kit See Installing the Rackmount Kit on page 33 Related...

Page 33: ... page 26 Determine Correct Rackmount Hardware on page 35 Install the Shelf Rails on page 37 Rackmount Kit Overview The rackmount kit has two shelf rail assemblies one for each side of the rack Each shelf rail is marked LEFT or RIGHT The shelf rails are mounted to the rack with four brackets two on each side Brackets for square hole racks are preattached to the shelf rails The rackmount kit also in...

Page 34: ... for racks with round mounting holes 2 3 M6 x 16 mm screws 16 4 Cage nuts 6 5 10 32 x 10 mm screws 12 6 Guide pins 2 7 M6 x 12 mm screws 16 8 M4 x 10mm flathead screws 4 9 10 32 shoulder screws 12 Note Some of the fastener bags that are included in the kit are not required to install this server 34 SPARC T8 4 Server Installation Guide September 2017 ...

Page 35: ...orner bezel SCREW SEMS M6 X 12 SCREW FLAT HEAD M4 X 10 Round hole 10 32 inside installation SCREW SHOULDER 10 32 SCREW FLAT HEAD M4 X 10 Round hole M6 inside installation SCREW SEMS M6 X 12 SCREW FLAT HEAD M4 X 10 Note Some of the fastener bags that are included in the kit are not required to install this server 3 Mark the rackmounting location See Mark the Rackmounting Location on page 36 Related...

Page 36: ...l space in the rack to install the server 2 Place the Rack Buddy template against the front rails The bottom edge of the template corresponds to the bottom edge of the server Measure up from the bottom of the template 3 Mark the mounting holes for the front shelf rails 4 Mark the mounting holes for the rear shelf rails Related Information Rack Compatibility on page 30 36 SPARC T8 4 Server Installa...

Page 37: ...n page 37 Install the Shelf Rails 1 Place the left shelf rail in the marked location Note The shelf rails are marked FRONT LEFT and FRONT RIGHT as viewed from the front of the server An up arrow indicates proper orientation 2 Secure the rear shelf rail bracket at the top and bottom holes using two Torx T30 screws Installing the Server 37 ...

Page 38: ...p 4 for the right shelf rail 6 Consider your next step If you are installing a CMA see Installing the CMA Optional on page 41 If you are installing the server into an equipment rack that will be shipped to another location see Installing the Shipping Brace Assembly Optional on page 45 If you are installing the server see Installing the Server on page 29 38 SPARC T8 4 Server Installation Guide Sept...

Page 39: ...For a two person installation all the CRUs must be removed and a lift is optional 1 Prior to installing the server confirm that you have removed the following components Both processor modules The main module All four power supplies All five fan modules Refer to the SPARC T8 4 Server Service Manual for removal instructions 2 If you are using a mechanical lift ensure that the lift is level and stab...

Page 40: ...Secure the server to the front panel using four No 2 Phillips screws 6 Replace all of the components that you removed Both processor modules The main module All four power supplies All five fan modules 40 SPARC T8 4 Server Installation Guide September 2017 ...

Page 41: ...naging and routing power and data cables attached to the back of the server Note This server with the CMA attached fits only into a 1200 mm rack These topics provide the information and tasks needed to install the CMA CMA Kit Overview on page 42 Install the CMA on page 43 Secure Cables Using the CMA on page 61 Related Information Installing the Rackmount Kit on page 33 Determine Correct Rackmount ...

Page 42: ... Description 1 CMA comb 2 M6 16 mm screws 4 3 Hook and loop straps 14 4 M6 cage nuts 4 5 M6 6 mm screws 6 6 Bracket adapters 2 Related Information Determine Correct Rackmount Hardware on page 35 42 SPARC T8 4 Server Installation Guide September 2017 ...

Page 43: ... to install the CMA See Determine Correct Rackmount Hardware on page 35 2 Attach the bracket adapters to the CMA comb Use six M6 x 6mm screws three on each side 3 If the server is already installed in the rack do the following a Remove the four faceplate screws two on each side Caution Do not loosen or remove the screws that secure the shelf rail brackets to the rack b At the rear of the server on...

Page 44: ...n the square hole racks c Push the server forward 3 in 76 mm 4 Attach the CMA to the rack posts using two M6 screws for each side 5 Consider your next steps If the server is already installed do the following 44 SPARC T8 4 Server Installation Guide September 2017 ...

Page 45: ... shipping brace assembly if you are installing the server into an equipment rack that will be shipped to another location Note These procedures describe how to install the server into a rack with square mounting holes If you are installing the server into a rack with round mounting holes see Determine Correct Rackmount Hardware on page 35 Determine Correct Shipping Brace Fasteners on page 47 Insta...

Page 46: ...ver into a vehicle or when you are installing the server into an equipment rack that will be shipped to another location for final installation The shipping braces and necessary fasteners are included with the rackmount kit No Description 1 Top rear shipping brace 2 2 Guide pins 2 3 Cage nuts 4 4 Bottom rear shipping brace 5 Screws 8 46 SPARC T8 4 Server Installation Guide September 2017 ...

Page 47: ...ne Correct Shipping Brace Fasteners Determine the correct fasteners for your shipping brace installation Rack Type Fastener Bags Required Square hole with corner bezel SCREW SEMS M6 X 12MM Tapped hole 10 32 SCREW SHOULDER 10 32 Tapped hole M6 SCREW SEMS M6 X 12MM Install the Top Rear Shipping Braces The top rear shipping braces are labeled TOP LFT REAR and TOP RGT REAR as viewed from the rear of t...

Page 48: ...ove the adapter 3 Insert and finger tighten the guide pin in the appropriate hole for your server 4 Secure the brace with two M6 x 12 mm screws 5 Repeat Step 1 through Step 4 for the top right shipping brace Related Information Determine Correct Shipping Brace Fasteners on page 47 Install the Bottom Rear Shipping Brace on page 49 48 SPARC T8 4 Server Installation Guide September 2017 ...

Page 49: ... at the bottom rear of the system 2 Secure each side of the bottom rear shipping brace with two M6 x 12 mm screws Related Information Determine Correct Shipping Brace Fasteners on page 47 Install the Top Rear Shipping Braces on page 47 Remove the Bottom Rear Shipping Brace on page 50 Installing the Server 49 ...

Page 50: ...n 1 Remove the four screws that secure the bottom shipping brace to the rack 2 Slide the shipping brace out from the rear of the rack Related Information Determine Correct Shipping Brace Fasteners on page 47 Install the Top Rear Shipping Braces on page 47 Install the Bottom Rear Shipping Brace on page 49 50 SPARC T8 4 Server Installation Guide September 2017 ...

Page 51: ...anagement Cables on page 58 4 Secure the cables with the CMA Secure Cables Using the CMA on page 61 Related Information Understanding the Server on page 11 Rear Panel Components on page 15 Installing the Server on page 29 Powering On the Server for the First Time on page 65 Cabling Requirements Minimum cable connections for the server At least one server on board Ethernet network connection NET po...

Page 52: ... disconnect USB cables and peripheral devices while the server is running without affecting server operations You can perform USB hot plug operations only while the OS is running USB hot plug operations are not supported when the server ok prompt is displayed or before the server has completed booting You can connect up to 126 devices to each of the four USB controllers for a total of 504 USB devi...

Page 53: ...Management Cables on page 58 USB Ports Two USB 3 0 ports are located at the rear panel Two additional USB 3 0 ports are located on the main module and are accessible from the front panel See the location of the USB ports at Front Panel Components on page 14 and Rear Panel Components on page 15 The USB ports support hot plugging You can connect and disconnect USB cables and peripheral devices while...

Page 54: ...ER MGT RJ 45 port located on the rear panel provides an TIA EIA 232 serial Oracle Cisco standard connection to the SP This port is the default connection to the Oracle ILOM SP For DTE to DTE communications you can use the supplied RJ 45 to DB 9 crossover adapter with a standard RJ 45 cable to achieve the required null modem configuration See Rear Panel Components on page 15 An additional SER MGT p...

Page 55: ...nnect the SER MGT Cable on page 59 Connect a Terminal or Emulator to the SER MGT Port on page 67 NET MGT Port The NET MGT RJ 45 port located on the rear panel provides an optional Ethernet connection to the SP The NET MGT port is an optional connection to the Oracle ILOM SP The SP NET MGT port uses an RJ 45 cable for a 10GBASE T connection If your network does not use a DHCP server this port will ...

Page 56: ...ling Requirements on page 51 Connect the NET MGT Cable on page 59 Assign a Static IP Address to the NET MGT Port on page 79 Ethernet Ports Four RJ 45 10 Gigabit full duplex auto negotiating Ethernet ports NET 0 NET 1 NET 2 NET 3 are located on the system rear panel See Rear Panel Components on page 15 The Ethernet interfaces operate at 100 Mbps 1 Gbps 10 Gbps Pin Signal Description Pin Signal Desc...

Page 57: ... one port on the front and one on the back of the server See Front Panel Components on page 14 and Rear Panel Components on page 15 Use a DB 15 video cable to connect to a video adapter to achieve the required connection The maximum supported resolution is 1024 x 768 Note Only one of the two ports can be used at a time The rear VGA port is disabled by default To enable the rear port and disable th...

Page 58: ... 51 Connect Other Data Cables on page 61 Connecting Data and Management Cables After you have connected these cables see Powering On the Server for the First Time on page 65 before connecting the AC power cords Caution Use only the power cords provided with the server Connect the SER MGT Cable on page 59 Connect the NET MGT Cable on page 59 Connect the Ethernet Network Cables on page 60 Connect Ot...

Page 59: ... appropriate crossover cable adapter to create the required null modem configuration Related Information Server Overview on page 12 Front Panel Components on page 14 Rear Panel Components on page 15 Cabling Requirements on page 51 Connect a Terminal or Emulator to the SER MGT Port on page 67 Connect the NET MGT Cable The SP NET MGT port is labeled NET MGT After the initial server configuration you...

Page 60: ...rt on page 55 Assign a Static IP Address to the NET MGT Port on page 79 Connect the Ethernet Network Cables The server has four RJ 45 network connectors labeled NET 0 NET 1 NET 2 and NET 3 Use these ports to connect the server to the network The Ethernet interfaces operate at 100 Mbps 1000 Mbps and 10000 Mbps See Rear Panel Components on page 15 for port locations Note The Oracle ILOM sideband man...

Page 61: ...ver is configured with additional I O components connect the external cables to the connectors contained on those components Related Information Server Overview on page 12 Rear Panel Components on page 15 Cabling Requirements on page 51 PCIe card documentation SPARC T8 4 Server Service Manual Secure Cables Using the CMA Use the CMA to secure cables and ensure proper cable routing 1 Nest and bundle...

Page 62: ...Using the CMA Use the supplied hook and loop fasteners to secure the cables in the CMA 2 If necessary tilt the CMA up or down to direct the cables as appropriate 62 SPARC T8 4 Server Installation Guide September 2017 ...

Page 63: ...ut to unlock the CMA comb Rotate the CMA comb up or down as needed and push the release tabs in to lock the CMA comb in the desired position Related Information Installing the CMA Optional on page 41 Cabling Requirements on page 51 Connecting Cables 63 ...

Page 64: ...64 SPARC T8 4 Server Installation Guide September 2017 ...

Page 65: ...alled OS on page 71 4 Configure the preinstalled OS or install a fresh OS Configure the Preinstalled OS on page 71 or Reach a State to Install a Fresh OS Oracle ILOM CLI on page 72 5 Set the configuration parameters for the Oracle Solaris OS Oracle Solaris OS Configuration Parameters on page 76 6 Optional Configure the NET MGT port to use a static IP address Assign a Static IP Address to the NET M...

Page 66: ...he rear of the server Do not attach the power cords to the power supplies at this time Related Information Rear Panel Components on page 15 Connect the Chassis Ground Wire on page 66 Power on the Server for the First Time on page 69 Connect the Chassis Ground Wire This procedure is optional for servers with AC input power It is acceptable to ground the server through the supplies and chassis groun...

Page 67: ... rack as long as the rack is properly grounded to the earth ground in the building Related Information Rear Panel Components on page 15 Power on the Server for the First Time on page 69 Connect a Terminal or Emulator to the SER MGT Port Prior to powering on the server for the first time make a serial connection to the SP from a terminal or terminal emulator After making this serial connection you ...

Page 68: ...d to the SER MGT port you will not see system messages 4 Optional Connect an Ethernet cable between the server s NET MGT port and the network to which future connections to the SP and host will be made Configure the system for the first time through the SER MGT port After the initial configuration you can set up communication between the SP and host through this Ethernet interface 5 Connect an Eth...

Page 69: ... password changeme for the default Administrator account root after your initial login to Oracle ILOM If this default Administrator account has been changed contact your system administrator for an Oracle ILOM user account with Administrator privileges For more information about the administration tasks such as changing passwords adding accounts and setting account privileges refer to the Oracle I...

Page 70: ...allation by installing the OS See Configure the Preinstalled OS on page 71 Related Information Connect the SER MGT Cable on page 59 Oracle ILOM System Console on page 70 Configure the Preinstalled OS on page 71 Reach a State to Install a Fresh OS Oracle ILOM CLI on page 72 Reach a State to Install a Fresh OS Oracle ILOM Web Interface on page 74 Oracle ILOM System Console When power is first applie...

Page 71: ...led OS on page 71 Reach a State to Install a Fresh OS Oracle ILOM CLI on page 72 Reach a State to Install a Fresh OS Oracle ILOM Web Interface on page 74 Assign a Static IP Address to the NET MGT Port on page 79 SPARC T8 Series Servers Administration Guide Oracle ILOM documentation Installing the OS Use these topics to either configure the preinstalled OS or use an alternative OS Configure the Pre...

Page 72: ... more details refer to the Oracle Solaris OS man pages and documentation at http www oracle com goto solaris11 docs Related Information Prepare the Power Cords on page 65 Connect a Terminal or Emulator to the SER MGT Port on page 67 Power on the Server for the First Time on page 69 Oracle Solaris OS Configuration Parameters on page 76 Reach a State to Install a Fresh OS Oracle ILOM CLI If you do n...

Page 73: ...ed To stop type The server might take several minutes to complete POST Then the OpenBoot prompt ok is displayed 5 Boot from the appropriate boot media for your installation method For more information refer to Installing Oracle Solaris 11 Systems comparing installation options at http www oracle com goto solaris11 docs For a list of valid boot commands type ok help boot boot specifier boot kernel ...

Page 74: ...r example you can boot and install the OS from external media or from another server on the network For more information refer to Installing Oracle Solaris 11 Systems comparing installation options at http www oracle com goto solaris11 docs 2 If you have not done so perform these tasks to access the Oracle ILOM web interface on the server a In a browser on the same network as the system type the I...

Page 75: ...layed continue to the next step 9 At the ok prompt boot from the appropriate boot media for your installation method For more information refer to Installing Oracle Solaris 11 Systems comparing installation options at http www oracle com goto solaris11 docs For a list of valid boot commands that you can enter at the OpenBoot prompt type ok help boot boot specifier boot kernel default or other file...

Page 76: ... the host name for the server IP Address Type the IP address for this Ethernet interface Subnet Select Yes or No according to your network environment Subnet Netmask If subnet was Yes Type the netmask for the subnet for your network environment IPv6 Specify whether or not to use IPv6 If you are not sure select No to configure the Ethernet interface for IPv4 Security Policy Select either standard U...

Page 77: ...tional until you configure network settings for the SP Note If you are unable to use DHCP on your network you must connect to the Oracle ILOM SPM using the SER MGT port to configure the NET MGT port for your network See Assign a Static IP Address to the NET MGT Port on page 79 Log In to the SP SER MGT Port on page 77 Assign a Static IP Address to the NET MGT Port on page 79 Related Information Ora...

Page 78: ...ed Lights Out Manager Version 4 0 x rxxxxx Copyright c 2017 Oracle and or its affiliates All rights reserved Warning password is set to factory default set HOST users root password Enter new password Enter new password again 2 Type root for the login name followed by your password hostname login root Password nothing displayed Oracle R Integrated Lights Out Manager Version 4 0 x Copyright c 2017 O...

Page 79: ...ocessor IPaddr Set pendingipaddress to service processor IPaddr To change the default IPv6 DHCP property and set property values for a static IPv6 address refer to the section Modifying Default Connectivity Configuration Properties in the Oracle ILOM Administrator s Guide for Configuration and Maintenance 3 Set the IP address for the SP gateway set SP network pendingipgateway gateway IPaddr Set pe...

Page 80: ...rue Note You can type the show SP network command again to verify that the parameters have been updated Related Information Configure the Preinstalled OS on page 71 Reach a State to Install a Fresh OS Oracle ILOM CLI on page 72 Reach a State to Install a Fresh OS Oracle ILOM Web Interface on page 74 Oracle Solaris OS Configuration Parameters on page 76 SPARC T8 Series Servers Administration Guide ...

Page 81: ...up and installing support automation on the server please refer to Oracle Auto Service Request Quick Installation Guide Or log in to your My Oracle Support account to access the Oracle Auto Service Request Doc ID 1185493 1 knowledge article located at http support oracle com epmos faces DocumentDisplay id 1185493 1 Both documents provide information on the necessary software required for ASR all n...

Page 82: ...82 SPARC T8 4 Server Installation Guide September 2017 ...

Page 83: ...stem recovery AWG American wire gauge B BMC Baseboard management controller BOB Memory buffer on board C chassis Server enclosure CMA Cable management arm SPARC T8 1 and SPARC T8 2 Cable management assembly SPARC T8 4 CMP Chip multiprocessor CRU Customer replaceable unit D DHCP Dynamic Host Configuration Protocol Glossary 83 ...

Page 84: ...s the Oracle Solaris OS and other applications The term host is used to distinguish the primary computer from the SP See SP hot pluggable Describes a component that can be replaced with power applied but the component must be prepared for removal hot swappable Describes a component that can be replaced with power applied and no preparation is required I ID PROM Chip that contains system informatio...

Page 85: ...Physical device address used for remote access configuration management See Oracle ILOMand SDM name name space Top level Oracle ILOM target NEBS Network Equipment Building System Netra products only NET MGT Network management port An Ethernet port on the server SP NIC Network interface card or controller NMI Nonmaskable interrupt NVMe Nonvolatile memory express controller The optional NVMe switch ...

Page 86: ... component interconnect PCIe PCI Express an industry standard bus architecture that supports high bandwidth peripherals and I O devices POST Power on self test PROM Programmable read only memory PSH Predictive self healing S SAS Serial attached SCSI SCC System configuration chip SCC PROM System configuration chip on programmable read only memory Removable module containing system configuration dat...

Page 87: ...gement control of the host See host SPM Service processor module This is the physical component that contains the service processor firmware SSD Solid state drive SSH Secure shell T Tma Maximum ambient temperature U U S NEC United States National Electrical Code UCP Universal connector port UI User interface UL Underwriters Laboratory Inc UTC Coordinated Universal Time UUID Universal unique identi...

Page 88: ...88 SPARC T8 4 Server Installation Guide September 2017 ...

Page 89: ... 61 Ethernet ports 60 NET MGT port 59 power cords 65 required connections 51 securing to CMA 61 SER MGT port 59 clearance airflow 20 service 20 CMA 23 33 hardware required 41 installing 41 43 kit 41 securing cables 61 compatible racks 30 30 components rear 15 D depth specifications 17 DHCP 59 diagnostics when run 70 DIMMs DIMM description 12 drives 12 E electrical specifications 18 elevation speci...

Page 90: ... 51 modem not for use with the SER MGT port 59 N NET MGT port assigning a static IP address to 79 cabling 59 DHCP 59 location 59 pinouts 55 59 static IP address 59 O Oracle ILOM system console 70 Oracle Solaris OS configuration parameters 76 configuring the preinstalled OS 71 installing a fresh OS Oracle ILOM CLI 72 installing a fresh OS Oracle ILOM web interface 74 P parity for serial terminal no...

Page 91: ...ssigning an IP address to 76 shipping brace fasteners determining correct 47 installing 45 installing bottom rear 49 installing top rear 47 removing bottom rear 50 shipping carton specifications 17 shipping kit CMA 23 shipping kit contents 23 site planning specifications 17 slots ports and LEDs illustrated 15 specifications acoustic 20 confirming 17 electrical 18 elevation 19 environmental 19 heig...

Page 92: ...Index described 12 front 14 pinouts 57 rear 15 W weight specifications 17 width specifications 17 92 SPARC T8 4 Server Installation Guide September 2017 ...

Reviews: