Preparing for Installation
These topics detail the precautions to follow, the tools to assemble, and the tasks to perform
prior to installing the server.
Step
Description
Links
1.
Confirm that you have received all the items you ordered
for the type of rackmount kit you will be using in your
installation.
2.
Review ESD and safety precautions.
“Handling Precautions” on page 25
3.
Verify that you have the correct tools.
“Tools Needed for Installation” on page 26
4.
Prepare the server for installation.
“Prepare the Server” on page 27
Related Information
■
“Installing the Server” on page 29
■
“Connecting Cables” on page 51
■
“Powering On the Server for the First Time” on page 65
Shipping Kit
Verify that you have received all of the components that ship with your server.
Note -
When you receive the server, place it in the environment where you will install it. Leave
it in its shipping crate at its final destination for 24 hours. This resting period prevents thermal
shock and condensation.
Preparing for Installation
23
Summary of Contents for SPARC T7-4
Page 1: ...SPARC T7 4 Server Installation Guide Part No E54993 04 March 2017 ...
Page 2: ......
Page 8: ...8 SPARC T7 4 Server Installation Guide March 2017 ...
Page 10: ...10 SPARC T7 4 Server Installation Guide March 2017 ...
Page 22: ...22 SPARC T7 4 Server Installation Guide March 2017 ...
Page 28: ...28 SPARC T7 4 Server Installation Guide March 2017 ...
Page 64: ...64 SPARC T7 4 Server Installation Guide March 2017 ...
Page 86: ...86 SPARC T7 4 Server Installation Guide March 2017 ...