Install the Cable Management Arm
Note -
To pull the green release tabs, place your finger in the center of each tab, not on the end,
and apply pressure as you pull the tab toward the front of the storage server.
b.
Continue pushing the storage server into the rack until the slide-rail locks
(located on the front of the storage server) engage the slide-rail assemblies.
You will hear an audible click when the storage server is in the normal rack position.
15.
Connect cables to the storage server, as required.
Refer to the Oracle Exadata Database Machine documentation for instructions.
Note -
Power cables should already be installed in the Sun Rack II 1042 (1000-mm) system
rack.
16.
Open the CMA cable covers, route storage server cables through the CMA's
cable troughs, close the cable covers, and secure the cables with the six Velcro
straps.
Route the cables through the cable troughs in this order:
Installing the Storage Server Into a Rack
51
Summary of Contents for EXADATA X6-2
Page 2: ......
Page 8: ...8 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Page 14: ...14 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Page 24: ...24 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Page 60: ...60 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Page 66: ...66 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...
Page 70: ...70 Oracle Exadata Storage Server X6 2 Extreme Flash Installation Guide July 2018 ...