op15 SET-UP
op15 SET-UP
PAGE: : 8
STEP 1
Once you have positioned your OPUS® in the desired location, engage the e-brake. Try to choose a site that is as level as possible and where the
ground is not too soft.
STEP 2
You can now un-hitch from your tow vehicle if you choose. The lock’n’roll two part hitch can be disconnected by removing the locking pin and
unhooking the two hook plates (see page 10 for more information on your hitch)
STEP 3
Raise or lower the tongue jack wheel to level your OPUS® Horizontally.
STEP 4
To drop down the corner steadies, pull the blue handle outwards until the leg drops down to a 90 degree angle from the trailer. Using the includ-
ed corner steady winder (or cordless drill/driver with a 3/4’’ Hex socket attachment) wind down each corner steady leg until it touches the ground.
Depending on the terrain, you may need to adjust each corner to level the OPUS® width ways.
STEP 5
Disconnect the four roof securing latches; Use your thumb to push in the release pin (see 5b & 5c below) then lift the handle to release the latch
from the hook completely.
STEP 6
At the back of the OP15 un-screw the black spare tire securing bolts until they can be removed from the hole completely.
STEP 7
Disconnect the spare tire securing latches using the red lever handle. Fold the handles & triangle pin downwards so they’re out of the way of the
rear panel. Fold down the spare tire bracket; the arm is gas-strut assisted to help with the weight. Fold the bracket down as far as it will go.
STEP 8
Use the push-buttons to open the rear panel securing locks. Lift the back panel upwards to the roof position.
WARNING
Please note that this panel will not yet remain in this position without completing the next step.