OP175 System Installation, Operation & Maintenance 

8

length if necessary.

NOTE: When cutting the tubing use a sharp tubing 

cutter or blade and make a clean, straight cut 

before inserting into a push-connect fitting. When 

routing tubing, do not make sharp bends or crimp 

the tubing.

4.  PROCESSOR TO TANK: Connect a piece of 

the 3/8” blue tubing to the OPTIMIZED WATER 

TO STORAGE TANK fitting on the processing 

unit.  Connect the other end of this tubing to the 

OPTIMIZED WATER TO STORAGE TANK INLET 

on the storage tank INLET DIVERT VALVE.

5.  REPRESSURIZATION ASSEMBLY TO 

PROCESSOR: Using two of the 1/2” hose barb 

inserts (supplied), a piece of 1/2” gray hose, 

and two hose clamps, connect hose from the 

REPRESSURIZATION ASSEMBLY OUTLET 

on the Repressurization Assembly to the 

TANK REPRESSURIZATION RETURN on the 

Processor. The ridged end of a hose barb insert 

goes into each end of the hose with a hose clamp 

tightened onto it. The smooth ends of the hose 

barb inserts go into the push-to-connect fittings on 

the Processor and Repressurization Assembly.

6.  OPTIMIZED WATER TO EQUIPMENT: Connect 

a piece of 1/2” i.d. gray hose the the OPTIMIZED 

WATER OUTLET on the processor with a 1/2” 

hose barb insert and clamp (supplied). The other 

end of this line will be connected to the distribution 

line that will deliver Optimized Water to the 

equipment at a later time.  Prepare any necessary 

plumbing to make the connection between the 

1/2” hose and distribution line, but for now leave 

the line loose and route the loose end of the 

gray hose into a drain or bucket (make certain 

the hose length will reach the storage tank - this 

will be required for the Start-Up procedures). 

The equipment connection will be completed in 

“Connect to Equipment.”

 Install QT Cartridges

NOTE: Before installing the QT Cartridges make sure 

to remove the four plugs in the QT heads.

1.  Insert the CTO-Q10 cartridges into QT heads 

1 & 2 (starting from the left or inlet side of the 

processor) and turn to align arrows.

2.  Insert the AMS-QT15 membrane cartridge into the 

QT head #3 and turn to align arrows. 

3.  Insert the MA-QT mineral addition cartridge into 

the QT head #4 (far right) and turn to align arrows. 

4.  Connect the Push-to-Connect elbow (remove plug 

in elbow) on the end of the black Reject tubing 

to the stem connector on the bottom of the AMS-

QT15 cartridge.

The Repressurization Pump and Buffer Tank assembly 

is on a stand that can be remote from the storage tank.  

Simply remove the four bolts on the feet of the bracket 

and lengthen the gray hose from the tank to the pump 

and the red bypass tubing from the Tank Inlet Divert 

Valve to the required length.  Four rubber feet and 

mounting screws are available to put on the bottom of 

the Tank Stand. Kit Part number 164-89116.

1

2

3

4

Inlet

Reject tubing connected to stem connector 

on bottom of AMS-QT15 Cartridge

Optimized

W

ater Outlet

Repressurization 

Assy Outlet

Optimized

Water Inlet

Tank Inlet Divert  

Valve- Shown in the 

normal positon

 Optional RP Assembly Location

Summary of Contents for OP175

Page 1: ...Installation Operation Maintenance Manual Rev 1 Manufactured By OptiPure Div of Procam Controls Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 OP175_manual_v1 indd 201...

Page 2: ...gree II 7 Indoor use only protect from elements Explanation of Symbols The following symbols are used on the water processor The symbols and their explanation is given below Earth ground WARNING Hazar...

Page 3: ...rating Pressure Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Reject Water Outlet 1 4 Push to Connect Connect to drain per local regulations 1 2 3 4 Optimized Water to Stor...

Page 4: ...ted within 5 feet of the location of the unit Drain must allow a minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drai...

Page 5: ...Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Water Quality Monitor Optimized Water to Storage Tank Inlet on Valve Repressurization Assembly Outlet Hose Barb Repressur izat...

Page 6: ...mp until completing the following section System Start Up Refer to Typical Installation diagram on page 5 and How to Use Our Quick Connect Fittings on page 16 when making the following connections A f...

Page 7: ...nsions IMPORTANT ALLOW A MINIMUM OF 24 IN FRONT OF THE PROCESSOR FOR MAINTENANCE AND SERVICE DO NOT MOUNT SYSTEM ABOVE THE CEILING OR IN A LOCATION THAT IS NOT EASILY ACCESSIBLE WHEN THE 16 GAL TANK A...

Page 8: ...e connection between the 1 2 hose and distribution line but for now leave the line loose and route the loose end of the gray hose into a drain or bucket make certain the hose length will reach the sto...

Page 9: ...ump will run more smoothly and the water flow from the gray hose will become steady 4 Unplug the RP Pump cord Connect to Equipment You are almost ready to enjoy the benefits of Optimized Water All tha...

Page 10: ...on to drain The pure water stream continues through the Permeate Check Valve 8 and through the Mineral Addition cartridge 2 then on to the tank through the Tank Inlet Divert Valve 11 on top of the St...

Page 11: ...the ability to measure membrane production by closing the Buffer Tank Valve 17 and turning the Tank Inlet Divert Valve 11 to the bypass or UP position This diverts the permeate pure water produced by...

Page 12: ...lve PN 524 20010 Pressure Gauge PN 530 20018 Reject Flow Control PN 564 02105 OUT Permeate Conductivity Probe Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check V...

Page 13: ...ge Tank PN 570 00016 Air Breather PN 300 40005 RP Pump PN 704 35513 Tank Bracket PN 594 80516 Buffer Tank PN 340 50001 Buffer Tank Valve PN 520 14501 Optimized Water Inlet Connect line from Optimized...

Page 14: ...d pushing up then turn a quarter turn to the right 5 If it is necessary to replace the Mineral Addition Cartridge repeat steps 4 5 for the Mineral Addition Cartridge 6 Install a piece of 3 8 tubing in...

Page 15: ...rt valve open the Sample Port and direct to a bucket or drain Turn the Tank Inlet Divert Valve to the Bypass or UP position Open the Water Supply Valve and put the Emergency Bypass Valve in the SERVIC...

Page 16: ...Push tubing straight in Resistance will be felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Ma...

Reviews: