OptiPure OP175 Installation, Operation & Maintenance Manual Download Page 5

OP175 System Installation, Operation & Maintenance 

5

 Typical Installation with Atmospheric Tank

Important: Plumbing should be performed by a qualified plumber in accordance with local codes.

Feed Water Line

 - 

Green - from Water Supply 

Valve to Feed Water Inlet

Feed 

Water

Optimized

(Treated) 

Water to

Equipment

Feed Water Inlet 

Connection

(behind valve)

Optimized Water Line 

- Blue 

- from Optimized Water Outlet to Tank Inlet

Drain Line

 

- Black - 

from Reject Outlet to Drain

Reject 

Water 

(to Drain)

User-Supplied 

Water Supply 

Valve

 & 

Pressure Gauge

Reject 

Water

Outlet 

Optimized 

Water Outlet

   to Equipmt 

Optional

Carbon 

Post-

Treatment

Repressurization 

Assembly

Air 

Breather

Power

120VAC, 2A

Optimized W

ater Line 

- 1/2" Gray Hose 

with hose barb insert - Make connection to  distribution and (optional) post-treatment.

CT

O-Q

Pre-Filter

CT

O-Q

Pre-Filter

Emergency 

Bypass Valve 

Operating 

Pressure 

Gauge

Membrane Reject Water 

Tubing Connection

AMS-QT15

 

Membrane C

ar

tri

dg

e

Water Quality 

Monitor 

Optimized 

Water to 

Storage Tank Inlet

(on Valve)

Repressurization 

Assembly Outlet

(Hose Barb)

Repressur-

ization Pump

120VAC

Buffer Tank

Buffer Tank Valve

(Normally Open, 

shown closed)

Tank Inlet 

Divert Valve 

(Valve handle 

normally in Down 

position. Turn to 

Up position to 

divert Optimized 

water to the 

sample port.)

1

3

2

Processor

Tank Full 

Shutoff Valve

(inside tank)

Optimized Water 

Storage Tank 

- 16 gal. Atmospheric

Tank

Repressurizaton 

Return

Optimized 

Water To

Storage Tank

Sample 

Port 

Mineral Addition

 

Cartridge

4

Pressurized Water Line 

- 1/2" Gray Hose with hose barb inserts at 

both ends - from Repressurization Assy Outlet to Pressurized Water Inlet.

IMPORTANT - THE SYTEM MUST BE IN-

STALLED INDOORS.  DO NOT INSTALL IN 

DIRECT SUNLIGHT OR WHERE EXPOSED TO 

FREEZING TEMPERATURES OR RAIN. IDEAL-

LY USE NON-METAL PIPING FOR OPTIMIZED 

WATER CONDUIT.

When installing keep lines from the 

Repressurization Assembly to the 

equipment as short as possible to 

minimize pressure loss. 

Bypass

Summary of Contents for OP175

Page 1: ...Installation Operation Maintenance Manual Rev 1 Manufactured By OptiPure Div of Procam Controls Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 OP175_manual_v1 indd 201...

Page 2: ...gree II 7 Indoor use only protect from elements Explanation of Symbols The following symbols are used on the water processor The symbols and their explanation is given below Earth ground WARNING Hazar...

Page 3: ...rating Pressure Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Reject Water Outlet 1 4 Push to Connect Connect to drain per local regulations 1 2 3 4 Optimized Water to Stor...

Page 4: ...ted within 5 feet of the location of the unit Drain must allow a minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drai...

Page 5: ...Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Water Quality Monitor Optimized Water to Storage Tank Inlet on Valve Repressurization Assembly Outlet Hose Barb Repressur izat...

Page 6: ...mp until completing the following section System Start Up Refer to Typical Installation diagram on page 5 and How to Use Our Quick Connect Fittings on page 16 when making the following connections A f...

Page 7: ...nsions IMPORTANT ALLOW A MINIMUM OF 24 IN FRONT OF THE PROCESSOR FOR MAINTENANCE AND SERVICE DO NOT MOUNT SYSTEM ABOVE THE CEILING OR IN A LOCATION THAT IS NOT EASILY ACCESSIBLE WHEN THE 16 GAL TANK A...

Page 8: ...e connection between the 1 2 hose and distribution line but for now leave the line loose and route the loose end of the gray hose into a drain or bucket make certain the hose length will reach the sto...

Page 9: ...ump will run more smoothly and the water flow from the gray hose will become steady 4 Unplug the RP Pump cord Connect to Equipment You are almost ready to enjoy the benefits of Optimized Water All tha...

Page 10: ...on to drain The pure water stream continues through the Permeate Check Valve 8 and through the Mineral Addition cartridge 2 then on to the tank through the Tank Inlet Divert Valve 11 on top of the St...

Page 11: ...the ability to measure membrane production by closing the Buffer Tank Valve 17 and turning the Tank Inlet Divert Valve 11 to the bypass or UP position This diverts the permeate pure water produced by...

Page 12: ...lve PN 524 20010 Pressure Gauge PN 530 20018 Reject Flow Control PN 564 02105 OUT Permeate Conductivity Probe Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check V...

Page 13: ...ge Tank PN 570 00016 Air Breather PN 300 40005 RP Pump PN 704 35513 Tank Bracket PN 594 80516 Buffer Tank PN 340 50001 Buffer Tank Valve PN 520 14501 Optimized Water Inlet Connect line from Optimized...

Page 14: ...d pushing up then turn a quarter turn to the right 5 If it is necessary to replace the Mineral Addition Cartridge repeat steps 4 5 for the Mineral Addition Cartridge 6 Install a piece of 3 8 tubing in...

Page 15: ...rt valve open the Sample Port and direct to a bucket or drain Turn the Tank Inlet Divert Valve to the Bypass or UP position Open the Water Supply Valve and put the Emergency Bypass Valve in the SERVIC...

Page 16: ...Push tubing straight in Resistance will be felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Ma...

Reviews: