OptiPure OP175 Installation, Operation & Maintenance Manual Download Page 14

OP175 System Installation, Operation & Maintenance 

14

The only routine maintenance required on the 

system is periodic replacement of the carbon/

sediment pre-filters and the mineral addition 

cartridge. The CTO-Q10 cartridges should be 

changed every 3-6 months depending on water 

usage.  In areas with high levels of sediment and 

other contaminants the CTO-Q10 cartridges may 

require more frequent changes.  The mineral 

addition cartridge should be changed when the 

Optimized Water TDS drops. 

Pre-Filter change procedure

1.  Either close the Water Supply Valve (shutting 

off all water flow), or put the Emergency 

Bypass Valve (on the Processor) in the 

System Bypass position (allowing untreated 

water to continue to flow to the equipment). 

 

2.  Wait a moment for system pressure to drain 

off.

3.  Once the system pressure has been relieved, 

remove the two CTO-Q10 cartridges by 

turning a quarter-turn to the left and pulling 

down on the cartridge.  

4.  Install the new CTO-Q10 cartridges into 

the QT heads by aligning the notches and 

pushing up, then turn a quarter-turn to the 

right.

5.  If it is necessary to replace the Mineral 

Addition Cartridge, repeat steps 4 - 5 for the 

Mineral Addition Cartridge.

6.  Install a piece of 3/8” tubing in the Processor 

Sample Port valve, open the Sample Port, 

and direct to a bucket or drain.

7.  Turn the Tank Inlet Divert Valve to the Bypass 

Mode (Handle Pointing UP).  

8.  Open the Water Supply Valve and put the 

Emergency Bypass Valve in the “SERVICE” 

position, allowing water to run into the new 

Pre-Filter cartridges and purge air through 

the system and out the Sample/Flush Port to 

drain.   

9.  Once the air has been purged and filters 

flushed, close the Sample Port valve and 

return the Tank Inlet Divert Valve to the 

Normal position (handle horizontal or down).  

9.  Check for leaks.

 

Optional Post-treatment cartridge change 

procedure

(if applicable)

1.  Close the ball valve at the inlet to the Post-

Treatment assembly.  

2.   Remove the existing cartridge and discard.

3.  Install the new cartridge.

4.  Open the ball valve and the RP pump should 

actuate filling the housing with water.  

 Routine Maintenance: Filter Change Procedure

CTO-Q10 Pre-

Filters

PN: 300-05828

Change Every 

3 to 6 months

MA-Q10 Mineral Addition 

Cartridge

PN: 300-05850

Summary of Contents for OP175

Page 1: ...Installation Operation Maintenance Manual Rev 1 Manufactured By OptiPure Div of Procam Controls Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 OP175_manual_v1 indd 201...

Page 2: ...gree II 7 Indoor use only protect from elements Explanation of Symbols The following symbols are used on the water processor The symbols and their explanation is given below Earth ground WARNING Hazar...

Page 3: ...rating Pressure Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Reject Water Outlet 1 4 Push to Connect Connect to drain per local regulations 1 2 3 4 Optimized Water to Stor...

Page 4: ...ted within 5 feet of the location of the unit Drain must allow a minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drai...

Page 5: ...Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Water Quality Monitor Optimized Water to Storage Tank Inlet on Valve Repressurization Assembly Outlet Hose Barb Repressur izat...

Page 6: ...mp until completing the following section System Start Up Refer to Typical Installation diagram on page 5 and How to Use Our Quick Connect Fittings on page 16 when making the following connections A f...

Page 7: ...nsions IMPORTANT ALLOW A MINIMUM OF 24 IN FRONT OF THE PROCESSOR FOR MAINTENANCE AND SERVICE DO NOT MOUNT SYSTEM ABOVE THE CEILING OR IN A LOCATION THAT IS NOT EASILY ACCESSIBLE WHEN THE 16 GAL TANK A...

Page 8: ...e connection between the 1 2 hose and distribution line but for now leave the line loose and route the loose end of the gray hose into a drain or bucket make certain the hose length will reach the sto...

Page 9: ...ump will run more smoothly and the water flow from the gray hose will become steady 4 Unplug the RP Pump cord Connect to Equipment You are almost ready to enjoy the benefits of Optimized Water All tha...

Page 10: ...on to drain The pure water stream continues through the Permeate Check Valve 8 and through the Mineral Addition cartridge 2 then on to the tank through the Tank Inlet Divert Valve 11 on top of the St...

Page 11: ...the ability to measure membrane production by closing the Buffer Tank Valve 17 and turning the Tank Inlet Divert Valve 11 to the bypass or UP position This diverts the permeate pure water produced by...

Page 12: ...lve PN 524 20010 Pressure Gauge PN 530 20018 Reject Flow Control PN 564 02105 OUT Permeate Conductivity Probe Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check V...

Page 13: ...ge Tank PN 570 00016 Air Breather PN 300 40005 RP Pump PN 704 35513 Tank Bracket PN 594 80516 Buffer Tank PN 340 50001 Buffer Tank Valve PN 520 14501 Optimized Water Inlet Connect line from Optimized...

Page 14: ...d pushing up then turn a quarter turn to the right 5 If it is necessary to replace the Mineral Addition Cartridge repeat steps 4 5 for the Mineral Addition Cartridge 6 Install a piece of 3 8 tubing in...

Page 15: ...rt valve open the Sample Port and direct to a bucket or drain Turn the Tank Inlet Divert Valve to the Bypass or UP position Open the Water Supply Valve and put the Emergency Bypass Valve in the SERVIC...

Page 16: ...Push tubing straight in Resistance will be felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Ma...

Reviews: