Operation
Version 1.0.4 dated 2018-08-27
Page 26
Translation of the original instructions
S 131 GH
GB
S131
GH_GB
_5.
fm
OPTIMUM
M A S C H I N E N - G E R M A N Y
®
5.3
Inserting the workpiece
Lift the saw arm arch and close the
stop valve.
Img.5-2:
Hydraulic feed
Place the piece to be cut in the work-
holder vice.
ATTENTION!
Risk of toppling the metal band saw.
Support long work pieces before
pushing the piece to be cut into the
work-holder vice.
Img.5-3:
Machine vice
Position the front clamping jaw with the
handle about 2 mm in front of the
workpiece.
Press the clamping lever downward.
ATTENTION!
Make sure, that the workpiece is really
firmly clamped.
Img.5-4:
Handle and clamping lever
5.4
Starting the metal belt saw
Connect the electrical supply cable.
Select the saw belt speed.
"Speed of saw belt“ on page 28
Press the push button "On".
5.5
Switching off the metal belt saw
Press the push button "Off".
Pull out the mains plug if the machine is not to be used for a protracted period.
5.6
Restarting the metal belt saw
If the motor circuit breaker is triggered, the metal belt saw must be restarted.
Disconnect the electrical supply cable from the power supply.
Reconnect the electrical supply cable.
Press the push button "Reset" .
Press the push button "On".
Feed regulation
valve
Stop valve
Clamping lever
Handle
Front clamping jaw
Clamping lever
Handle
Front clamping jaw