Assembly Upright drill B34 H/ B34 H Vario ; Version 1.0.5
2
014
US
3.3
Storage
ATTENTION!
Improper storage may cause important parts to be damaged or destroyed.
Store packed or unpacked parts only under the following ambient conditions.
Please follow the instructions and indications on the transportation box.
3.4
Installation and assembly
3.4.1
Site requirements
Organize the working space around the upright drill according to the local safety regulations.
INFORMATION
In order to provide for good functionality and high machining accuracy as well as long durability
of the machine the site should fulfill certain criteria.
Observe the following items:
The device must only be installed and operated in dry ventilated places.
Avoid places nearby machines generating chips or dust.
The site has to be vibration-free, i.e. at a distance from presses, planing machines, etc.
The substructure has to be appropriate for upright drill. Also make sure that the load bearing
capacity and the evenness of the floor are appropriate.
The substructure has to be prepared in a way that possibly used coolant cannot penetrate
into the ground.
Protruding parts such as stops, handles, etc. need to be secured by measures provided by
the customer if necessary in order to avoid dangers for persons.
Provide sufficient space for assembly and operating staff as well as for material transport.
Also allow for accessibility for setting and maintenance works.
Make sure that the main power of the drilling machine is freely accessible.
Fragile goods (goods require careful handling)
Protect against humidity and humid environments
„Environmental conditions“ on page 17.
Prescribed position of the packaging box (marking
the top side – arrows pointing upward)
Maximum stacking height
Example: non-stackable – do not pile any further
packaging boxes on top of the first packaging box