OPTIMUM
M A S C H I N E N - G E R M A N Y
Assembly and commissioning
Version 1.0.1 dated 2016-02-23
Page 25
Original operating instructions
MZ4
│
MZ4V
GB
3
Assembly and commissioning
INFORMATION
The milling machine is delivered pre-assembled. It is delivered in a transport box. After the
unpacking and the transportation to the installation site it is necessary to mount and assemble
the individual components of the milling machine.
3.1
Unpacking the machine
Install the machine close to its final position before unpacking. If the packaging shows signs of
having possibly been damaged during transport, take the appropriate precautions to prevent
the machine being damaged when unpacking. If damage is discovered, the carrier and/or ship-
per must be notified immediately so the necessary steps can be taken to register a complaint.
Examine the complete machine carefully and check whether all materials, such as shipping
documents, instructions and accessories have been delivered with the machine.
3.1.1 Standard accessories
- 1 x Oil bottle for oil cups
- 3 x Open-ended spanner (2)
- 1 set Allen key (3)
- 1 x Hand lever for spindle sleeve feed (4)
- 1 x Philips and flat screwdriver (5)
- 1 x ISO 40 - MT3 adapter (6)
- 1 x MT2 morse taper (7)
- 1 x MT1 morse taper (8)
- 1 x drill drift for morse taper (9)
- Adjusting discs and adjusting screws (10)
- Dirt cover: drive
Vertical spindles (11)
- ISO 40 collet chuck with various collets
(12) 5-6 ; 7-8 ; 9-10 ; 11-12 ; 15-16 ; 19-20
; 24-25
-
"Arbors for side milling cutter“ on page
- Frequency converter operating Instruc-
tions on CD
- Test report machine accuracy
- Operating instructions in printed form
4
1
6
2
3
5
10
7
8
9
11
12