background image

Version 1.0.4 - 2020-07-28

64

Translation of original instruction

MH22V

MH22VD

EN

MH

22

V_MH2

2

VD_G

B_8.

fm

8.4

Liability claims/warranty

Beside the legal liability claims for defects of the customer towards the seller, the manufacturer
of the product, OPTIMUM GmbH, Robert-Pfleger-Straße 26, D-96103 Hallstadt, does not grant
any further warranties unless they are listed below or were promised in the framework of a sin-
gle contractual provision.
The processing of the liability claims or of the warranty is performed as chosen by OPTIMUM
GmbH either directly or through one of its dealers. 
Any defective products or components of such products will either be repaired or replaced by
components which are free from defects. Title to replaced products or components is trans-
ferred to OPTIMUM Maschinen Germany GmbH.
The automatically generated original proof of purchase which shows the date of purchase, the
type of machine and the serial number, if applicable, is the precondition in order to assert liabil-
ity or warranty claims. If the original proof of purchase is not presented, we are not able to per-
form any services. 
Defects resulting from the following circumstances are excluded from liability and warranty
claims:

Use of  the product beyond the technological capability and intended use, in particular due 
to overloading of the machine.

Damage caused personally through incorrect use or failure to observe our operating 
instructions, 

negligent or incorrect handling and use of improper operating materials.

Unauthorized modifications and repairs.

Insufficient installation and safeguarding of the machine.

Disregarding the installation requirements and conditions of use.

Atmospheric discharges, overvoltage and lightning strokes as well as chemical influences.

Neither are the following items covered by liability or warranty claims:

Wearing parts and components which are subject to normal and intended wear, such as V-
belts, ball bearings, lighting, filters, seals, etc.

Non reproducible software errors

Any services, which OPTIMUM GmbH or one of its agents performs in order to fulfil any addi-
tional warranty are neither an acceptance of the defects nor an acceptance of its obligation to
compensate. These services neither delay nor interrupt the warranty period.
The court of jurisdiction for legal disputes between businessmen is Bamberg.
If any of the aforementioned agreements is totally or partially inoperative and/or invalid, a provi-
sion which nearest approaches the intent of the guarantor and remains within the framework of
the limits of liability and warranty which are specified by this contract is deemed agreed.

8.5

Advice for disposal / Options of reuse: 

Please dispose of your equipment in an environmentally friendly manner, by not placing waste
in the environment but in a professional manner.
Please do not simply throw away the packaging and later the disused machine, but dispose of
both in accordance with the guidelines laid down by your city council/local authority or by an
authorised disposal company.

Summary of Contents for 3338135

Page 1: ...Operating Manual Version 1 0 4 Milling machine Part no 3338135 Part no 3338136 MH22V...

Page 2: ...1 15 Electronics 16 1 16 Inspection deadlines 16 2 Technical specification 2 1 Electrical connection 17 2 2 Milling capacity 17 2 3 Spindle seat 17 2 4 Drill mill head 17 2 5 Milling table 18 2 6 Dim...

Page 3: ...oard 42 6 Ersatzteile Spare parts 6 1 Ersatzteilbestellung Ordering spare parts 45 6 2 Hotline Ersatzteile Spare parts Hotline 45 6 3 Service Hotline 45 6 4 Elektrische Ersatzteile Electrical spare pa...

Page 4: ...tenance all maintenance works and functional tests are described which the operator must perform in regular intervals The illustration and information included in the present manual can possibly devia...

Page 5: ...g the milling machine Always keep this documentation close to the milling machine If you want to re order the operating instructions for your machine please quote the relevant serial number The serial...

Page 6: ...Other pictograms Symbol Alarm expression Definition consequence DANGER Impending danger that will cause serious injury or death to people WARNING A danger that can cause serious injury or death CAUTIO...

Page 7: ...tools and tool holders need to be observed The milling machine must only be installed and operated in a dry and well ventilated areas The milling machine is designed and manufactured to be used in a...

Page 8: ...non flammable materials may be machined with the milling machine In order to avoid misuse the operating instructions must be read and understood before first commissioning Operators must be duly quali...

Page 9: ...ricating agents for hard materials e g steel and generally always back the spindle out of the workpiece while it is still turning CAUTION Do not use the drill chuck as a milling tool Never clamp a mil...

Page 10: ...appropriate training course These courses are also offered by adult education centres in Germany 1 6 2 Obligations of the User The user must have read and understood the operating manual be familiar w...

Page 11: ...rsonnel WARNING Inappropriate operation and maintenance of the machine constitutes a danger for personnel property and the environment Only authorized personnel may operate the machine Authorized oper...

Page 12: ...ire and explosion by using flammable materials or cooling lubricants Extra precautionary measures must be taken before machining flammable materials e g alu minium magnesium or using combustible agent...

Page 13: ...in use The emergency stop button brings the machine to a standstill Turn the knob to the right to unlock and release the emergency stop button Img 1 1 Emergency stop button 1 9 2 Separation guard Adj...

Page 14: ...e only the positions which are marked with the adjoining pictogram Img 1 3 Main switch 1 10 Safety check Check the milling machine regularly Check all safety devices before starting work once a week w...

Page 15: ...sembly operation maintenance and repair Use protective glasses Switch off the milling machine before measuring the workpiece Do not work on the milling machine if your concentration is reduced for exa...

Page 16: ...electrician prior to initial commissioning and after modifications or repairs prior to recommissioning and at set intervals The intervals must be set so that foreseeable defects can be detected in a t...

Page 17: ...ng capacity in steel S235JR mm 20 Drilling capacity in steel S235JR mm 16 Max milling head size mm 52 Max end mill cutter size mm Possible usable size with BT20 12 2 3 Spindle seat Spindle seat BT20 7...

Page 18: ...is travel mm 175 2 6 Dimensions Fastening to the Machine Base on page 24 Total weight kg 116 2 7 Work area Keep a work area of at least one metre around the machine free for operation and maintenance...

Page 19: ...essarily a safe working level Though there is a dependency between the degree of the noise emission and the degree of the noise disturbance it is not possible to use it reliably to determine if furthe...

Page 20: ...Version 1 0 4 2020 07 28 20 Translation of original instruction MH22V MH22VD EN MH22V_MH22VD_GB_2 fm 2 12 Dimensions 775 170 650 160 745 950 700 180...

Page 21: ...uspension equipment that might break under load can cause severe injuries or even death Check that the lifting and load suspension gear has sufficient load bearing capacity and that it is in perfect c...

Page 22: ...ely so the necessary steps can be taken to register a complaint Examine the complete machine carefully and check whether all materials such as shipping documents instructions and accessories have been...

Page 23: ...stallation site must be free from vibrations also at a distance of presses planing machines etc Provide sufficient space for the personnel preparing and operating the machine and trans porting the mat...

Page 24: ...g may only take place after proper installation First commissioned of the milling machine by inexperienced personnel or inexperienced users constitute a risk to personnel and equipment We do not accep...

Page 25: ...experts and warning This is a product of category C2 according to EN 61800 3 This product may cause radio interference in a residential area In this case it may be necessary for the ope rator to take...

Page 26: ...pindles are running smoothly All spindle nuts are re adjustable INFORMATION The milling machine has been painted with varnish This fact must be taken into account when selecting your cooling lubricant...

Page 27: ...ion of original instruction MH22V MH22VD EN MH22V_MH22VD_GB_3 fm 3 10 Optional machine base A A B B C A A B B C 40 40 340 800 100 35 135 280 310 50 375 P14 4x 3 3 5 5 303 250 300 420 Fixing points on...

Page 28: ...anical securing quick clamping system 8 Milling table 9 Clamping lever 10 Display Depth display or speed display 11 Switching over display Millimetres or inches for depth display 12 Switching over dis...

Page 29: ...stop the machine during normal operation 4 5 Resetting an emergency stop situation Unlock the emergency stop switch again Switch on the spindle rotation again 4 6 Power failure Restoring readiness for...

Page 30: ...nchronous milling Only with recirculating ball screws can the use of synchronous milling be undertaken sensibly This instruction manual assumes that the milling machine has been obtained without recir...

Page 31: ...0 or another pos sible future name e g ISO 7388 1 A 20 can also be used Ask our Customer Services or use the illustrated drawing in the technical data or use our online catalogue in which accessories...

Page 32: ...specific cutting force kc1 1 and the chip thickness exponent mc are dependent on the material used Both parameters are present in tabular reference books and must be investi gated for the correspondin...

Page 33: ...ng screw on the milling head Turn the drill mill head to the desired position Retighten the fastening screw INFORMATION The milling head should be aligned after resetting to the initial position with...

Page 34: ...button PROG in order to change the fundamental value of the axis Modification of the basic value of X Y Z After entering this option the basic value is highlighted and the digital bit is located in t...

Page 35: ...te value in the X axis display Decimal point Selection of decimal places 2 or 3 decimal places Channel setup Multilevel menus press the PROG key to enter the menu to modify X Y Z as well as the speed...

Page 36: ...S200 there are 4 possibilities to choose from 2 m 5 m 10 m 50 m Use a resolution of 50 microns for the magnetic tapes with the item no 3383978 or 3383979 or 3383980 Other magnetic tapes from other man...

Page 37: ...so be in good order and condition 5 1 Safety WARNING The consequences of incorrect maintenance and repair work may include extremely serious injuries to those working on the milling machine and damage...

Page 38: ...erval Where What How Start of work after every main tenance or repair work Milling machine Safety check on page 14 Start of work after every main tenance or repair work Dovetail guides Oiling Oil all...

Page 39: ...cessary to check if there is still smooth movement over the entire path otherwise wear is considerably increased due to friction between the spindle nut and the spindle Img 5 1 Milling head When neces...

Page 40: ...e entire path otherwise wear is con siderably increased due to friction between the spindle nut and the spindle Img 5 3 Milling table Spindle nut Milling table Reset Y axis Img 5 4 Milling table When...

Page 41: ...n however the request for a customer service techni cian can only be made via your specialist dealer If the repairs are carried out by qualified technical personnel they must follow the indications gi...

Page 42: ...n the potentiometer in direction plus For thread cutting we recommend little torque Slope This is the potentiometer to set the acceleration time of the motor at the moment when it starts turning If yo...

Page 43: ...U2004V TU2304V GB Adjusting_control board_BA integrated_GB fm Measuring range min 1 M Ohm Potentiometer Setting value Only approximate value perform setting via speed control Measuring points measurin...

Page 44: ...Version 1 0 4 2020 7 28 44 Original operating instructions TU1503V TU2004V TU2304V GB Adjusting_control board_BA integrated_GB fm Setting CL Setting Torque Setting Acel...

Page 45: ...e article no is located in the spare parts list Die Seriennummer befindet sich am Typschild The serial no is on the rating plate 6 2 Hotline Ersatzteile Spare parts Hotline 49 0 951 96555 118 ersatzte...

Page 46: ...Version 1 0 4 2020 7 28 46 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm 6 6 Fr sfutterschutz Mill chuck safety Img 6 1 Fr sfutterschutz Mill chuck safety 114 115 116 117 118 119 120 121 122...

Page 47: ...6 7 Fr skopf Milling head Img 6 2 Fr skopf Milling head 20 47 50 26 97 101 76 25 24 69 62 68 112 112 10 67 63 65 64 68 35 14 45 33 4 46 49 43 48 27 34 2 15 1 32 16 31 30 2 39 53 52 51 59 60 55 54 59 5...

Page 48: ...leitung MH22V DE EN MH22V_parts fm 6 8 Fr skopf Milling head Img 6 3 Fr skopf Milling head 19 13 12 75 111 74 110 81 79 82 83 85 86 87 93 91 94 92 29 71 5 108 32 113 72 109 22 7 8 11 6 9 113 70 98 99...

Page 49: ...DE EN MH22V_parts fm 6 9 Kreuztisch Cross table Img 6 4 Kreuztisch Cross table 24 1 1 34 35 29 30 24 6 28 16 18 23 5 4 37 32 30 29 28 19 16 2 35 34 25 8 27 27 15 41 42 43 33 17 22 17 14 33 17 40 39 7...

Page 50: ...1 0 4 2020 7 28 50 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm 6 10 S ule Column Img 6 5 S ule Column 1 29 29 28 2 26 18 18 17 24 30 13 14 5 6 7 15 25 11 27 3 28 15 9 10 22 19 12 16 20 21 4...

Page 51: ...Version 1 0 4 2020 7 28 51 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm 6 11 Schaltbox Switch box Img 6 6 Schaltbox Switch box 1 8 2 7 4 6 5 3...

Page 52: ...Version 1 0 4 2020 7 28 52 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm 6 12 Maschinenschilder Machine labels Abb 6 7 Maschinenschilder Machine labels 1 2 3 4...

Page 53: ...Version 1 0 4 2020 7 28 53 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm 6 13 Schaltplan Wiring diagram...

Page 54: ...Version 1 0 4 2020 7 28 54 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm...

Page 55: ...Version 1 0 4 2020 7 28 55 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm...

Page 56: ...mill head Pos Bezeichnung Designation Menge Gr sse Artikelnummer Qty Size Item no 1 Spindelmutter Spindle nut 1 03338135101 2 Klemmschraube Clamping screw 2 03338135102 3 Frontabdeckung Front cover 1...

Page 57: ...ting key 1 DIN 6885 A 4 x 4 x 16 042P4416 50 Innensechskantschraube Socket head screw 3 GB 70 85 M5 x 12 51 Welle Shaft 1 03338135151 52 Platte Plate 1 03338135152 53 Schaltgabel Switch fork 1 0333813...

Page 58: ...lter Holder 1 03338135199 100 Innensechskantschraube Socket head screw 2 ISO 4762 M3 x 12 101 Zugentlastung Strain relief 2 033381351101 102 Schmiernippel Lubrication cup 2 6 0340105 103 Winkel Angle...

Page 59: ...gellager Ball bearing 1 6000 0406000R 26 Innensechskantschraube Socket head screw 2 ISO 4762 M6 x 20 27 Passfeder Fitting key 3 DIN 6885 A 4 x 4 x 12 042P4412 28 Federblech Spring plate 3 29 Scheibe W...

Page 60: ...ket head screw 4 GB 70 85 M8 x 20 25 Passfeder Fitting key 2 DIN 6885 A 4 x 4 x 16 042P4416 26 Innensechskantschraube Socket head screw 4 ISO 4762 M5 x 8 27 Passfeder Fitting key 1 DIN 6885 A 4 x 4 x...

Page 61: ...tz Safety switch for chuck protection 1 2A1 Steuerkarte 608B Control board 608B 1 1M3 Antriebsmotor Drive motor 1 03338135127 2H7 1 2H7 2 Maschinenlampe Machine lamp 2 Osram 12V 10W G4 033381351104 2R...

Page 62: ...Spindle seat on page 17 Motor does not start Defective fuse Circuit breaker Have it checked by qualified personnel Rattle the spindle if the workpiece surface is rough Upcut mill machining not possib...

Page 63: ...l quick clamping system System with collet instead of a drawbar Drill chuck Drill bit adapter Collet Holder for end mill Drill mill head Upper part of the milling machine Quill Hollow shaft in which t...

Page 64: ...operating instructions negligent or incorrect handling and use of improper operating materials Unauthorized modifications and repairs Insufficient installation and safeguarding of the machine Disrega...

Page 65: ...te manage ment If appropriate call on the help of a specialist waste disposal company for the treatment of the material Please make sure that electrical components are disposed of professionally and i...

Page 66: ...erial reuse The packaging wood can be supplied to the disposal or the reuse Any packaging components made of cardboard box can be chopped up and supplied to the waste paper collection The films are ma...

Page 67: ...a risk to the environment and public health Recycling of material will help reduce the consumption of raw materials For further information about the recycling of this product please consult your Dis...

Page 68: ...Version 1 0 4 2020 07 28 68 Translation of original instruction MH22V MH22VD EN MH22V_MH22VD_GB_8 fm...

Page 69: ...art 1 General requirements EN 13849 1 2015 Safety of machinery Safety related parts of controls Part 1 General design principles EN 13849 2 2012 Safety of machinery Safety related parts of controls Pa...

Page 70: ...ain switch 13 Malfunctions 62 O Obligations of the operator 11 Operator 11 user 10 Operation DRO5 34 P Personal protective equipment 21 Power failure 29 Q Qualification of personnel Safety 10 R Readju...

Page 71: ...MH 22 VD OPTImill MH 22 Ersatzteile OPTImill MH 22 Zubeh r OPTImill Zubeh r Ihr Ersatzteil nicht in den Listen Direkt zum Formular Download Tragen sie Ihr Maschinenmodell samt Bauteil und Artikelnr un...

Reviews: