background image

Version 1.0.1 - 2020-4-9

19

Originalbetriebsanleitung

GU 5 | GU 5-H

DE | EN

GU5_G

U5_GU5

-H_par

ts.

fm

8.4

Schaltplan Stromverteiler - Wiring diagram power distribution

Anschlüsse - Connections

A - Anschluss Schleifmaschine - Grinding machine connection - CEE 400V 16A

B - 230V Schutzkontaktsteckdose - 230 V socket with earthing-contact

C - Versorgungsanschluss Absaugung - Supply connection for extraction unit - CEE 400V 16A

D - Versorgungsanschluss Gebläse - Supply connection for blower

Summary of Contents for 3107114

Page 1: ...EN Operating Manual Extraction unit Version 1 0 1 Item no 3107124 GU 5 H GU 5 Item no 3107114 GU 5 GU 5 H...

Page 2: ...Unpacking 11 3 4 Commissioning 11 4 Operation 4 1 Extraction unit function description 12 4 2 Functional Description of the Electrical Connections 12 4 3 General information 12 4 4 Fire and Explosion...

Page 3: ...nce all maintenance works and functional tests are described which the operator must perform in regular intervals The illustration and information included in the present manual can possibly deviate f...

Page 4: ...icable regulations of each country must be observed If necessary relevant measures must be taken to comply with national regulations before commissioning the extraction unit Always keep this documenta...

Page 5: ...s INFORMATION Practical tips and other important or useful information and notes No dangerous or harmful consequences for people or objects In case of specific dangers we replace the pictogram with or...

Page 6: ...for all occupational exposure limit values as well as for non flammable dust with carcinogenic substances The clean air is emitted back to the location Use in dust areas with potentially explosive atm...

Page 7: ...ility that potentially toxic highly toxic carcinogenic mutagenic or reprotoxic substances are released further protective measures are necessary according to 10 of the German Ordinance on Hazardous Su...

Page 8: ...ioning if the manufacturer or installer has confirmed to the operator that the electrical system and operating materials have been procured in accordance with the stipulations of the accident preventi...

Page 9: ...more the noise emission also depends on production engineering factors e g speed material and clamping conditions INFORMATION The mentioned numerical value is the emission level Electrical connection...

Page 10: ...damping behaviour other noise sources e g the number of machines other processes taking place in proximity and the period of time during which the operator is exposed to the noise Furthermore it is po...

Page 11: ...y occur if parts of the machine tumble or fall down from the forklift truck or from the transport vehicle Follow the instructions and information on the transport box 3 3 Unpacking Install the extract...

Page 12: ...er fans switch off as soon as machine or device connected to the 400 V socket is switched off INFORMATION The blower fans switch on only when the possible extension cable used or the 400 V socket have...

Page 13: ...air loose clothing fingers and other body parts away from the openings and moving parts of the device Do not use the device if the power cable or connector are damaged The power cable must be checked...

Page 14: ...nce redu ces after empirical values on the part of the opera tor Exhaust air Cleaning Replacing Wash the exhaust air filter with water dry and reinsert If necessary replace the exhaust air filter afte...

Page 15: ...we are not able to perform any services Defects resulting from the following circumstances are excluded from liability and warranty claims Use of the product beyond the technological capability and i...

Page 16: ...as household waste According to the European directive 2011 65 EG regarding disused electrical and electronic devices and the implementation in national law disused electrical tools and electrical equ...

Page 17: ...s on the type plate 8 2 Elektrische Ersatzteile Electrical spare parts 8 2 1 Schaltplan Wiring diagram Der aktuelle Schaltplan mit Ersatzteilliste befindet sich im Schaltschrank der Maschine oder befi...

Page 18: ...05 6 Dichtung Seal 1 0310711406 7 Beh lter Vessel 1 0310711407 8 Knopf Knob 1 0310711408 9 Verschlussschraube Locking screw 4 0310711409 10 Filter Filter 1 0310711410 11 Abdeckung Cover 1 0310711411 1...

Page 19: ...diagram power distribution Anschl sse Connections A Anschluss Schleifmaschine Grinding machine connection CEE 400V 16A B 230V Schutzkontaktsteckdose 230 V socket with earthing contact C Versorgungsan...

Page 20: ...substances in electrical and elect ronic equipment 2015 863 EU The following harmonized standards were applied EN 60335 1 Household and similar electrical appliances Safety Part 1 General requirement...

Page 21: ...5 GU 5 H EN GU5_GU5 H_GBSIX fm Index C Copyright 15 E Electrical connection 9 I Inspection deadlines 8 L Liability claims for defects 15 M Malfunctions 14 S Safety instructions 4 T Technical specifica...

Page 22: ...Version 1 0 1 2020 04 09 22 Translation of original instruction GU 5 GU 5 H EN GU5_GU5 H_GBSIX fm...

Reviews: