Version 1.0.1 - 2020-04-09
11
Montageanleitung
GU 5 | GU 5-H
EN
GU5_G
U5-H_G
B_3.
fm
3
Delivery, interdepartmental transport, unpacking
INFORMATION
The extraction unit is mounted fully assembled. It is delivered in a transport box. The GU5-H
machine base can be filled with concrete ( DIY store Ready-dry concrete to mix ) in the lower
area by the operator in order to achieve sufficient rigidity.
3.1
Delivery
Check the status of the extraction unit immediately upon receipt and claim possible damages at
the last carrier also if the packing is not being damaged. In order to ensure claims towards the
freight carrier we recommend you to leave the machines, devices and packing material for the
time being in the status at which you have determined the damage or to take photos of this sta-
tus. Please inform us about any other claims within six days after receipt of delivery.
Check if all parts are firmly seated.
3.2
Interdepartmental transport
WARNING!
Severe or fatal injuries may occur if parts of the machine tumble or fall down from the
forklift truck or from the transport vehicle. Follow the instructions and information on the
transport box.
3.3
Unpacking
Install the extraction unit close to its final position before unpacking. If the packaging shows
signs of having possibly been damaged during transport, take the appropriate precautions to
prevent the extraction unit being damaged when unpacking. If damage is discovered, the car-
rier and/or shipper must be notified immediately so the necessary steps can be taken to register
a complaint.
Examine the complete extraction unit carefully and check whether all materials, such as
shipping documents, instructions and accessories have been delivered with the extraction unit.
3.4
Commissioning
During the connection of several hoses at the extraction ports, it must be ensured that a
leakage resistance of 10
6
Ohm is not exceeded.
The electric supply connection must be equipped with a neutral conductor.
Centres of gravity
Load suspension points
(Marking of the positions for the load suspension
gear)
Prescribed transport position
(Marking of the top surface)
Means of transport to be used
Weights