Page 28
8.7 SZ-STL2
1.
Screw the pillar on the base. (Fig. 14)
F
Fig. 14
ig. 14
F
Fig. 15
ig. 15
F
Fig. 17
ig. 17
FFig. 16
ig. 16
①
2.
Tighten the screw to lock the pillar. (Fig. 15)
3.
Insert the drop preventing ring and fix it at the desired height
by screwing the fixing knob. (Fig. 16)
4.
Insert the horizontal arm and secure it with the fixing screw
①
(Fig. 17).
Summary of Contents for SZ-STL1
Page 15: ...Page 15 7 Instrument description 7 1 System Diagram...
Page 67: ...Pagina 67 7 Descrizione dello strumento 7 1 Diagramma di Sistema...
Page 119: ...P gina 119 7 Descripci n del instrumento 7 1 Diagrama del Sistema...
Page 171: ...Page 171 7 Description de l instrument 7 1 Diagramme de Syst me...
Page 223: ...Seite 223 7 Beschreibung des Instruments 7 1 Systemdiagramm...
Page 275: ...P gina 275 7 Descri o do instrumento 7 1 Diagrama de Sistema...