
4
INSTALLATION
Unpacking and Inspection
Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should
have received the following items inside of package:
Inverter CD User manual Communication cable
Preparation
Before connecting all wirings, please take off bottom cover by removing two screws as shown below.
Mounting the Unit
Consider the following points before selecting where to install:
Do not mount the inverter on flammable construction materials.
Mount on a solid surface.
Install this inverter at eye level in order to allow the LCD display to be
read at all times.
The ambient temperature should be between 0°C and 55°C to ensure
optimal operation.
The recommended installation position is to be adhered to the wall
vertically.
Be sure to keep other objects and surfaces as shown in the right
diagram to guarantee sufficient heat dissipation and to have enough
space for removing wires.
SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY.
Install the unit by screwing two screws. It’s recommended to use M4 or M5 screws.