17
L2 phase
The inverter is operated in L2 phase
in 3-phase application.
L3 phase
The inverter is operated in L3 phase
in 3-phase application.
29
Reset PV energy storage
Not reset(Default)
Reset
30
Start charging time for AC
charger
00:00 (Default)
The setting range of start charging time for AC charger is from
00:00 to 23:00, increment of each click is 1 hour.
31
Stop charging time for AC
charger
00:00 (Default)
The setting range of stop charging time for AC charger is from
00:00 to 23:00, increment of each click is 1 hour.
32
Scheduled time for AC output
on
00:00 (Default)
The setting range of scheduled Time for AC output on is from
00:00 to 23:00, increment of each click is 1 hour.
33
Scheduled time for AC output
off
00:00(Default)
The setting range of scheduled Time for AC output off is from
00:00 to 23:00, increment of each click is 1 hour.
34
Set country customized
regulations
India(Default)
If selected, acceptable feed-in grid
voltage range will be
195.5~253VAC. Acceptable feed-in
grid frequency range will be
49~51Hz.
Germany
If selected, acceptable feed-in grid
voltage range will be
184~264.5VAC. Acceptable feed-in
grid frequency range will be
47.5~51.5Hz.