23
3.
PV1 & PV2 inputs
4.
DC SIWTCH (Optional)
5.
RS485 connector, for monitoring and communication
6.
CANbus port: Connected for multiple units operation
7.
Cable gland for Generator remote control
8.
AC Mains input
9.
AC Loads output
Connecting AC Mains
1.
Open side cover for wiring
2.
Select L and N wires as right
figure and table
5
below:
Cross Section
(mm
2
)
Maximum Length for 1% Loss (Meter)
SP5000 Vitality-S
2.5
7
4
11
6
16
3.
Insert wires through the cable gland
4.
Crimp the wires with y-terminal
5.
Insert wires with terminals, fix them according to polarity and torque
on terminals as figure
6.
Tighten the cable gland
5
The table is based on 20°C environment, installer need to adjust according to application and
local regulation