I N S T A L L A T I O N
38 / 90
ZE800_manual_ger_eng_it_V1.0.2.doc
..............................................................................
R. Kistler
3. Installation
3.1 Inspecting the shipment
Keep the shipping cartons and the packaging material for the ship-
ping company or the sales agency. If parts of the system were dam-
aged during transport, please submit a transport damage claim to
your supplier within 24 hours. Should you discover damage after ac-
cepting the equipment, please claim this as hidden damage.
3.2 Unpacking the UPS system
CAUTION
If the UPS system is unpackaged at low ambient tempera-
tures, condensation may form on the outside and inside of
the housing. Install the UPS system only when the inside and
outside are completely dry (risk of an electric shock)
The UPS system is heavy (see
Technical Data
). Use caution
when unpacking and transporting the UPS system
NOTE
Move and open the packaged UPS system carefully. Leave
the components in the packaging until these are installed.
To unpack the housing and the accessories:
1. Open the outer carton, remove the accessory parts that are
packaged with the UPS system.
2. Carefully lift the UPS system out of the outer carton.
3. Place the UPS system in a protected area that is sufficiently
ventilated and free of moisture and flammable gases and cor-
rosion.
Summary of Contents for ZINTO E 800
Page 2: ...2 90 ZE800_manual_ger_eng_it_V1 0 2 doc R Kistler ...
Page 30: ...30 90 ZE800_manual_ger_eng_it_V1 0 2 doc R Kistler ...
Page 32: ...32 90 ZE800_manual_ger_eng_it_V1 0 2 doc R Kistler ...
Page 60: ...60 90 ZE800_manual_ger_eng_it_V1 0 2 doc R Kistler ...
Page 62: ...62 90 ZE800_manual_ger_eng_it_V1 0 2 doc R Kistler ...
Page 88: ...D A T I T E C N I C I 88 90 ZE800_manual_ger_eng_it_V1 0 2 doc R Kistler 8 3 Dichiarazione CE ...
Page 90: ...90 90 ZE800_manual_ger_eng_it_V1 0 2 doc R Kistler ...