ONEAC Sinergy UPS User Manual
15
Fig. 16: Wiring Diagram for the SE61
Fig. 17: Wiring Diagram for the SE101
NOTE:
120 A or 120B must be limited to 1/2 nameplate rated current. It is user’s responsibility to fuse or
breaker these outputs.
Table 2. Minimum Requirements for Sinergy Series UPS Installation
Term ID
Description
SE61 (SE41)
SE101 (SE81)
SE203 (SE153)
Min.
Wire
Gauge
(awg)
Term
Torque
(in-lbs)
Min.
Wire
Temp.
(°C)*
Min.
Wire
Gauge
(awg)
Term
Torque
(in-lbs)
Min.
Wire
Temp.
(°C)*
Min.
Wire
Gauge
(awg)
Term
Torque
(in-lbs)
Min.
Wire
Temp.
(°C)*
GND
Chassis Ground
**
40
75
**
45
75
**
45
90
L1/N
Line 1
8
40
75
6
45
75
4
45
90
L2
Line 2
8
40
75
6
45
75
4
45
90
L3
Line 3
N/A
N/A
N/A
N/A
N/A
N/A
4
45
90
120A
120 V from Neutral
10
35
75
6
45
75
4
45
90
0
Neutral 10
35
75
6
45
75
4
45
90
88B
208 V from 120A
10
35
75
6
45
75
4
45
90
120B
120 V from Neutral
10
35
75
6
45
75
4
45
90
GND
Chassis Ground
opt
35
75
opt
45
75
opt
45
90
+
+240 VDC to -
N/A
N/A
N/A
4
45
75
4
45
75
-
Battery Common
N/A
N/A
N/A
4
45
75
4
45
75
GND
Chassis Ground
N/A
N/A
N/A
4
45
75
4
45
75
* Use insulated copper wire rated 75 C minimum.
** Must be no smaller than wire connected to L1/N and L2 (for SE61 and SE101) or L1, L2, L3 (for SE203).
GND L1/N
L2
120A
0
88B
120B GND
208
120
120
LINE
OUTPUT
X3
X4
X2
X1
GND
L1/N
L2
120A
0
88B
120B GND
208
120
120
LINE
OUTPUT
+
-
GND
BATTERY
X3
X4
X2
X1
LINE
B
A
TTER
Y
OUTPUT